A note on a reliability redundancy allocation problem using a tuned parameter genetic algorithm
暂无分享,去创建一个
[1] N. Jawahar,et al. A genetic algorithm for optimal operating parameters of VMI system in a two-echelon supply chain , 2007, Eur. J. Oper. Res..
[2] Xin-She Yang,et al. Discrete cuckoo search algorithm for the travelling salesman problem , 2014, Neural Computing and Applications.
[3] Chia-Ling Huang. A particle-based simplified swarm optimization algorithm for reliability redundancy allocation problems , 2015, Reliab. Eng. Syst. Saf..
[4] Hsing-Chih Tsai. Integrating artificial bee colony and bees algorithm for solving numerical function optimization , 2013, Neural Computing and Applications.
[5] David W. Coit,et al. System reliability optimization with k-out-of-n subsystems and changing k , 2011, The Proceedings of 2011 9th International Conference on Reliability, Maintainability and Safety.
[6] Charles E. Wells,et al. Reliability analysis of a single warm-standby system subject to repairable and nonrepairable failures , 2014, Eur. J. Oper. Res..
[7] Franciszek Grabski. 6 – SM models of renewable cold standby system , 2015 .
[8] Wei-Chang Yeh,et al. Orthogonal simplified swarm optimization for the series-parallel redundancy allocation problem with a mix of components , 2014, Knowl. Based Syst..
[9] Asoke Kumar Bhunia,et al. Genetic algorithm based multi-objective reliability optimization in interval environment , 2012, Comput. Ind. Eng..
[10] Way Kuo,et al. An annotated overview of system-reliability optimization , 2000, IEEE Trans. Reliab..
[11] Gregory Levitin,et al. Cold vs. hot standby mission operation cost minimization for 1-out-of-N systems , 2014, Eur. J. Oper. Res..
[12] Emanuel Falkenauer,et al. Genetic Algorithms and Grouping Problems , 1998 .
[13] Shujuan Jiang,et al. An approach for test data generation using program slicing and particle swarm optimization , 2014, Neural Computing and Applications.
[14] Gregory Levitin,et al. A joint reliability-redundancy optimization approach for multi-state series-parallel systems , 2009, Reliab. Eng. Syst. Saf..
[15] Charles E Ebeling,et al. An Introduction to Reliability and Maintainability Engineering , 1996 .
[16] R. Tavakkoli-Moghaddam,et al. Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithm , 2008, Reliab. Eng. Syst. Saf..
[17] Anindya Sundar Dhar,et al. Real-time fault-tolerance with hot-standby topology for conditional sum adder , 2015, Microelectron. Reliab..
[18] Wei Huang,et al. A reliability model of a warm standby configuration with two identical sets of units , 2015, Reliab. Eng. Syst. Saf..
[19] Ray J. Paul,et al. Optimising a complex discrete event simulation model using a genetic algorithm , 2005, Neural Computing & Applications.
[20] Chengbin Chu,et al. Reliability allocation problem in a series-parallel system , 2005, Reliab. Eng. Syst. Saf..
[21] Ping-Feng Pai,et al. A group decision classifier with particle swarm optimization and decision tree for analyzing achievements in mathematics and science , 2014, Neural Computing and Applications.
[22] David W. Coit,et al. Maximization of System Reliability with a Choice of Redundancy Strategies , 2003 .
[23] Chengbin Chu,et al. A new dynamic programming method for reliability & redundancy allocation in a parallel-series system , 2005, IEEE Transactions on Reliability.
[24] Celso Marcelo Franklin Lapa,et al. A Particle Swarm Optimization (PSO) approach for non-periodic preventive maintenance scheduling programming , 2010 .
[25] Seyed Taghi Akhavan Niaki,et al. A genetic algorithm for vendor managed inventory control system of multi-product multi-constraint economic order quantity model , 2011, Expert Syst. Appl..
[26] M. Gen,et al. A computational algorithm for solving 0-1 goal programming with GUB structures and its application for optimization problems in system reliability , 1990 .
[27] Nam Kee Lee,et al. System Reliability Allocation and a Computational Algorithm , 1968 .
[28] D. Coit. Cold-standby redundancy optimization for nonrepairable systems , 2001 .
[29] Gregory Levitin,et al. Optimal sequencing of warm standby elements , 2013, Comput. Ind. Eng..
[30] Ceki Franko,et al. Reliability of coherent systems with a single cold standby component , 2015, J. Comput. Appl. Math..
[31] Douglas C. Montgomery,et al. Response Surface Methodology: Process and Product Optimization Using Designed Experiments , 1995 .
[32] Manju Agarwal,et al. Reliability evaluation and optimal design in heterogeneous multi-state series-parallel systems , 2011, Inf. Sci..
[33] Mitsuo Gen,et al. Genetic algorithms and engineering design , 1997 .
[34] C. Hwang,et al. Optimization Techniques for System Reliability with RedundancyߞA Review , 1977, IEEE Transactions on Reliability.
[35] N. Sancho,et al. A hybrid ‘dynamic programming/depth-first search’ algorithm, with an application to redundancy allocation , 2001 .
[36] Randy L. Haupt,et al. Practical Genetic Algorithms , 1998 .
[37] Sadeghi Javad,et al. A parameter-tuned Genetic Algorithm for Vendor Managed Inventory Model for a Case Single-vendor Single-retailer with Multi-product and Multi-constraint , 2011 .
[38] Seyed Taghi Akhavan Niaki,et al. A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: An NSGA-II with tuned parameters , 2014, Comput. Oper. Res..
[39] Gregory Levitin,et al. Optimal component loading in 1-out-of-N cold standby systems , 2014, Reliab. Eng. Syst. Saf..