Construction 4.0: The Future of the Construction Industry in South Africa

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry. Keywords—Building information technology, Construction 4.0, Industry 4.0, Smart Site.

[1]  Niraj Thurairajah,et al.  Advantages and Challenges of Using BIM: a Cost Consultant’s Perspective , 2013 .

[2]  Sisa Mbeki,et al.  CAUSES, EFFECTS AND IMPACT OF SHORTAGES OF SKILLED ARTISANS ON CONTRACTOR PRODUCTIVITY , 2014 .

[3]  Rui Pedro Lopes Fernandes,et al.  Advantages and disadvantages of bim platforms on construction site , 2013 .

[4]  Jin-Hee Kim,et al.  Performance of Modular Prefabricated Architecture: Case Study-Based Review and Future Pathways , 2016 .

[5]  Frantisek Zezulka,et al.  Industry 4.0 – An Introduction in the phenomenon , 2016 .

[6]  Frank Teuteberg,et al.  Understanding the implications of digitisation and automation in the context of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry , 2016, Comput. Ind..

[7]  Krishnan Umachandran,et al.  Industry 4.0 , 2019, Advances in Civil and Industrial Engineering.

[8]  Yang Lu,et al.  Industry 4.0: A survey on technologies, applications and open research issues , 2017, J. Ind. Inf. Integr..

[9]  Luka Goji Tipili,et al.  Evaluating the effects of communication in construction project delivery in Nigeria , 2014 .

[10]  Riaan Fischer PRODUCTIVITY IN THE CONSTRUCTION INDUSTRY , 2010 .

[11]  Anne Fitchett,et al.  Skills development and employment creation through small public buildings in South Africa , 2009 .

[12]  A. A. Olatunji,et al.  Influences on construction project delivery time , 2010 .

[13]  Pollaphat Nitithamyong,et al.  Web-based construction project management systems: how to make them successful? , 2004 .

[14]  Mm Kumaraswamy,et al.  Problems in Technology Transfer vs Potential for Technology Exchange , 2000 .

[15]  Oluwole Alfred Olatunji,et al.  Modelling the costs of corporate implementation of building information modelling , 2011 .

[16]  Jasper Mbachu,et al.  Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland , 2015 .

[17]  Vicente González,et al.  A Production Model for Construction: A Theoretical Framework , 2015 .

[18]  Jochen Teizer,et al.  Fusing passive RFID and BIM for increased accuracy in indoor localization , 2015 .

[19]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[20]  Stephen Mak A model of information management for construction using information technology , 2001 .

[21]  Nafkote Tesfahun Adugna A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa , 2015 .

[22]  Javad Majrouhi Sardroud,et al.  Influence of RFID technology on automated management of construction materials and components , 2012 .

[23]  Sherif Ali Mohtady Mohamed,et al.  Factors affecting the performance of construction projects in the Gaza Strip , 2009 .