Influence of Highway Project Characteristics on Contract Type Selection: Empirical Assessment

The selection of appropriate type of contract for a highway maintenance project can be influenced by project attributes such as the expected cost and duration. However, the expected project cost and planned duration depend on other project attributes and also depend on each other. These simultaneous relationships complicate the identification of the appropriate contract for a highway maintenance project. While previous research has provided insight into the factors that affect project cost and duration, the validity of the findings may have been stymied by a lack of explicit consideration of the simultaneous relationships between project duration and cost. In this paper, we develop a framework based on a three-stage least-squares model to identify the most appropriate type of contract given the project’s attributes while explicitly accounting for the simultaneity between project cost and duration. The framework can also be used to estimate the expected contract duration and cost on the basis of the projec...

[1]  J. Horowitz,et al.  Critical Path Problems with Concave Cost-Time Curves , 1972 .

[2]  Natalya Stankevich,et al.  Contrats bases sur les resultats pour la preservation et l'amelioration des actifs routiers , 2009 .

[3]  Khaled Nassar,et al.  Using Weibull Analysis for Evaluation of Cost and Schedule Performance , 2005 .

[4]  D. R. Fulkerson A Network Flow Computation for Project Cost Curves , 1961 .

[5]  A. Goldberger A course in econometrics , 1991 .

[6]  Kumares C. Sinha,et al.  Performance-Based Contracting for Roadway Maintenance Operations in Indiana , 2008 .

[7]  P Pakkala INNOVATIVE PROJECT DELIVERY METHODS FOR INFRASTRUCTURE , 2002 .

[8]  Chris Hendrickson,et al.  Hierarchical Rule‐Based Activity Duration Estimation , 1987 .

[9]  Athanasios P. Chassiakos,et al.  Time-Cost Optimization of Construction Projects with Generalized Activity Constraints , 2005 .

[10]  I-Tung Yang,et al.  Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability , 2005 .

[11]  Priyanka Singh,et al.  Cost-Effectiveness Evaluation of Warranty Pavement Projects , 2007 .

[12]  Konstantina Gkritza,et al.  Cost Savings Analysis of Performance-Based Contracts for Highway Maintenance Operations , 2010 .

[13]  Stephan Foldes,et al.  PERT and crashing revisited: Mathematical generalizations , 1990 .

[14]  Florida Legislature,et al.  OFFICE OF PROGRAM POLICY ANALYSIS AND GOVERNMENT ACCOUNTABILITY , 1996 .

[15]  I-Tung Yang,et al.  Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .

[16]  Mohan M. Kumaraswamy,et al.  Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .

[17]  Martin Skutella,et al.  Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem , 1997, Math. Oper. Res..

[18]  Zohar J. Herbsman,et al.  LANE RENTAL--INNOVATIVE WAY TO REDUCE ROAD CONSTRUCTION TIME , 1998 .

[19]  J. Hausman Specification tests in econometrics , 1978 .

[20]  Cengiz Haksever,et al.  Flexible Model for Time'Cost Tradeoff Problem , 2004 .

[21]  Nicole Ribreau Highway Maintenance Outsourcing Experience: Synopsis of Washington State Department of Transportation's Review , 2004 .

[22]  David W. Hosmer,et al.  Applied Survival Analysis: Regression Modeling of Time-to-Event Data , 2008 .

[23]  W. Verdini,et al.  Nonlinear time/cost tradeoff models in project management , 1995 .