Influence of Highway Project Characteristics on Contract Type Selection: Empirical Assessment
暂无分享,去创建一个
Samuel Labi | Matthew G. Karlaftis | Fred Moavenzadeh | Bob G. McCullouch | Panagiotis Ch. Anastasopoulos | Panagiotis Ch. Anastasopoulos | S. Labi | M. Karlaftis | F. Moavenzadeh | B. McCullouch
[1] J. Horowitz,et al. Critical Path Problems with Concave Cost-Time Curves , 1972 .
[2] Natalya Stankevich,et al. Contrats bases sur les resultats pour la preservation et l'amelioration des actifs routiers , 2009 .
[3] Khaled Nassar,et al. Using Weibull Analysis for Evaluation of Cost and Schedule Performance , 2005 .
[4] D. R. Fulkerson. A Network Flow Computation for Project Cost Curves , 1961 .
[5] A. Goldberger. A course in econometrics , 1991 .
[6] Kumares C. Sinha,et al. Performance-Based Contracting for Roadway Maintenance Operations in Indiana , 2008 .
[7] P Pakkala. INNOVATIVE PROJECT DELIVERY METHODS FOR INFRASTRUCTURE , 2002 .
[8] Chris Hendrickson,et al. Hierarchical Rule‐Based Activity Duration Estimation , 1987 .
[9] Athanasios P. Chassiakos,et al. Time-Cost Optimization of Construction Projects with Generalized Activity Constraints , 2005 .
[10] I-Tung Yang,et al. Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability , 2005 .
[11] Priyanka Singh,et al. Cost-Effectiveness Evaluation of Warranty Pavement Projects , 2007 .
[12] Konstantina Gkritza,et al. Cost Savings Analysis of Performance-Based Contracts for Highway Maintenance Operations , 2010 .
[13] Stephan Foldes,et al. PERT and crashing revisited: Mathematical generalizations , 1990 .
[14] Florida Legislature,et al. OFFICE OF PROGRAM POLICY ANALYSIS AND GOVERNMENT ACCOUNTABILITY , 1996 .
[15] I-Tung Yang,et al. Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .
[16] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[17] Martin Skutella,et al. Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem , 1997, Math. Oper. Res..
[18] Zohar J. Herbsman,et al. LANE RENTAL--INNOVATIVE WAY TO REDUCE ROAD CONSTRUCTION TIME , 1998 .
[19] J. Hausman. Specification tests in econometrics , 1978 .
[20] Cengiz Haksever,et al. Flexible Model for Time'Cost Tradeoff Problem , 2004 .
[21] Nicole Ribreau. Highway Maintenance Outsourcing Experience: Synopsis of Washington State Department of Transportation's Review , 2004 .
[22] David W. Hosmer,et al. Applied Survival Analysis: Regression Modeling of Time-to-Event Data , 2008 .
[23] W. Verdini,et al. Nonlinear time/cost tradeoff models in project management , 1995 .