A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting
暂无分享,去创建一个
Min Xie | Tongdan Jin | Zhigang Tian | T. Jin | M. Xie | Z. Tian | Zhigang Tian
[1] Andrei Sleptchenko,et al. Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems , 2002 .
[2] Peter Tavner,et al. Reliability analysis for wind turbines , 2007 .
[3] C. C. Sherbrooke. Multiechelon inventory systems with lateral supply , 1992 .
[4] Rommert Dekker,et al. Optimal maintenance of multi-component systems: a review , 2008 .
[5] M. Hand,et al. Wind Turbine Design Cost and Scaling Model , 2006 .
[6] Barış Selçuk. An adaptive base stock policy for repairable item inventory control , 2013 .
[7] Sameer Vittal,et al. Performance and Reliability Analysis of Wind Turbines Using Monte Carlo Methods Based on System Transport Theory , 2005 .
[8] Walter L. Smith,et al. ON THE SUPERPOSITION OF RENEWAL PROCESSES , 1954 .
[9] A.B.M. Zohrul Kabir,et al. A stocking policy for spare part provisioning under age based preventive replacement , 1996 .
[10] Erhan Kutanoglu,et al. Logistics network design with inventory stocking for low-demand parts: Modeling and optimization , 2009 .
[11] Peter Knights,et al. A decision-making framework to integrate maintenance contract conditions with critical spares management , 2014, Reliab. Eng. Syst. Saf..
[12] Timothy S. Vaughan,et al. Production , Manufacturing and Logistics Failure replacement and preventive maintenance spare parts ordering policy , 2004 .
[13] Hakan Tarakci,et al. Maintenance-outsourcing contracts for a system with backup machines , 2014 .
[14] Rajesh Piplani,et al. A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..
[15] Ruud H. Teunter,et al. Matching Demand and Supply to Maximize Profits from Remanufacturing , 2003, Manuf. Serv. Oper. Manag..
[16] Song Jin,et al. Managing availability improvement efforts with importance measures and optimization , 2004 .
[17] Geert-Jan van Houtum,et al. Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..
[18] Ling Wang,et al. A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure , 2009, Eur. J. Oper. Res..
[19] Min Xie,et al. Joint Maintenance and spare Component Provisioning Policy for k-out-of-n Systems , 2013, Asia Pac. J. Oper. Res..
[20] Marco Macchi,et al. A model for considering the impact of rescheduling planned maintenance activities in a maintenance service contract , 2014 .
[21] John A. Muckstadt,et al. Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System , 2006, Manuf. Serv. Oper. Manag..
[22] Sven Axsäter,et al. Modelling Emergency Lateral Transshipments in Inventory Systems , 1990 .
[23] Craig C. Sherbrooke,et al. Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..
[24] Serguei Netessine,et al. Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..
[25] Geert-Jan van Houtum,et al. Capacitated two-indenture models for repairable item systems , 2001 .
[26] Baris Selçuk,et al. Joint spare parts inventory and reliability decisions under a service constraint , 2013, J. Oper. Res. Soc..
[27] Ananth V. Iyer,et al. Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies , 2006, Oper. Res..
[28] Matthieu van der Heijden,et al. Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems , 2009 .
[29] Stephen C. Graves,et al. A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .
[30] Yi-Kuei Lin,et al. A Dominant Maintenance Strategy Assessment Model for Localized Third-Party Logistics Service under Performance-Based Consideration , 2013 .
[31] Houyuan Jiang,et al. Performance-Based Contracts for Outpatient Medical Services , 2012, Manuf. Serv. Oper. Manag..
[32] James T. Simpson,et al. Defining and Implementing Performance-Based Logistics in Government , 2005 .
[33] U. D. Kumar,et al. Spares provisioning under performance-based logistics contract: profit-centric approach , 2008, J. Oper. Res. Soc..
[34] Yu Tian,et al. Optimizing reliability and service parts logistics for a time-varying installed base , 2012, Eur. J. Oper. Res..
[35] Dragan Banjevic,et al. Optimization models for critical spare parts inventories—a reliability approach , 2011, J. Oper. Res. Soc..
[36] Rob A. Zuidwijk,et al. On the use of installed base information for spare parts logistics: a revieuw of ideas and industry practice , 2010 .
[37] Wenbin Wang,et al. A stochastic model for joint spare parts inventory and planned maintenance optimisation , 2012, Eur. J. Oper. Res..
[38] W. J. Kennedy,et al. An overview of recent literature on spare parts inventories , 2002 .
[39] Liliane Pintelon,et al. The Effect of Maintenance Quality on Spare Parts Inventory for a Fleet of Assets , 2013, IEEE Transactions on Reliability.
[40] Kamran Moinzadeh,et al. Two-Parameter Approximations For Multi-Echelon Repairable Inventory Models With Batch Ordering Policy , 1987 .
[41] P. Wang,et al. Planning performance based contracts considering reliability and uncertain system usage , 2012, J. Oper. Res. Soc..