A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting

Recently the service industry is transitioning from material-based contracting to performance-based contracting. This paradigm shift enables the supplier to maximize the profit by attaining the system performance goal, while the customer is able to lower the asset ownership cost with assured system availability. Prior studies usually focus on a single stakeholder, either the supplier or the customer, in searching for the optimal decisions. Under game-theoretical framework, this paper proposes a multi-party, multi-criteria, and multi-item service delivery mechanism to maximize the utilities of all the stakeholders. The goals are achieved by jointly optimizing the maintenance, the spares inventory, and the repair capacity under the game-theoretical framwork. We prove that the supplier’s actions on parts replacement time, spares stock level and repair cycle times are fully observable to the customer. Hence a first-best solution is guaranteed without moral hazard issue. Numerical studies from wind industry show that a single or a consolidated multi-item contract could be advantageous over multiple single-item contracts as it ensures a higher profit margin at a lower customer’s cost.

[1]  Andrei Sleptchenko,et al.  Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems , 2002 .

[2]  Peter Tavner,et al.  Reliability analysis for wind turbines , 2007 .

[3]  C. C. Sherbrooke Multiechelon inventory systems with lateral supply , 1992 .

[4]  Rommert Dekker,et al.  Optimal maintenance of multi-component systems: a review , 2008 .

[5]  M. Hand,et al.  Wind Turbine Design Cost and Scaling Model , 2006 .

[6]  Barış Selçuk An adaptive base stock policy for repairable item inventory control , 2013 .

[7]  Sameer Vittal,et al.  Performance and Reliability Analysis of Wind Turbines Using Monte Carlo Methods Based on System Transport Theory , 2005 .

[8]  Walter L. Smith,et al.  ON THE SUPERPOSITION OF RENEWAL PROCESSES , 1954 .

[9]  A.B.M. Zohrul Kabir,et al.  A stocking policy for spare part provisioning under age based preventive replacement , 1996 .

[10]  Erhan Kutanoglu,et al.  Logistics network design with inventory stocking for low-demand parts: Modeling and optimization , 2009 .

[11]  Peter Knights,et al.  A decision-making framework to integrate maintenance contract conditions with critical spares management , 2014, Reliab. Eng. Syst. Saf..

[12]  Timothy S. Vaughan,et al.  Production , Manufacturing and Logistics Failure replacement and preventive maintenance spare parts ordering policy , 2004 .

[13]  Hakan Tarakci,et al.  Maintenance-outsourcing contracts for a system with backup machines , 2014 .

[14]  Rajesh Piplani,et al.  A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..

[15]  Ruud H. Teunter,et al.  Matching Demand and Supply to Maximize Profits from Remanufacturing , 2003, Manuf. Serv. Oper. Manag..

[16]  Song Jin,et al.  Managing availability improvement efforts with importance measures and optimization , 2004 .

[17]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[18]  Ling Wang,et al.  A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure , 2009, Eur. J. Oper. Res..

[19]  Min Xie,et al.  Joint Maintenance and spare Component Provisioning Policy for k-out-of-n Systems , 2013, Asia Pac. J. Oper. Res..

[20]  Marco Macchi,et al.  A model for considering the impact of rescheduling planned maintenance activities in a maintenance service contract , 2014 .

[21]  John A. Muckstadt,et al.  Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System , 2006, Manuf. Serv. Oper. Manag..

[22]  Sven Axsäter,et al.  Modelling Emergency Lateral Transshipments in Inventory Systems , 1990 .

[23]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[24]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..

[25]  Geert-Jan van Houtum,et al.  Capacitated two-indenture models for repairable item systems , 2001 .

[26]  Baris Selçuk,et al.  Joint spare parts inventory and reliability decisions under a service constraint , 2013, J. Oper. Res. Soc..

[27]  Ananth V. Iyer,et al.  Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies , 2006, Oper. Res..

[28]  Matthieu van der Heijden,et al.  Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems , 2009 .

[29]  Stephen C. Graves,et al.  A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .

[30]  Yi-Kuei Lin,et al.  A Dominant Maintenance Strategy Assessment Model for Localized Third-Party Logistics Service under Performance-Based Consideration , 2013 .

[31]  Houyuan Jiang,et al.  Performance-Based Contracts for Outpatient Medical Services , 2012, Manuf. Serv. Oper. Manag..

[32]  James T. Simpson,et al.  Defining and Implementing Performance-Based Logistics in Government , 2005 .

[33]  U. D. Kumar,et al.  Spares provisioning under performance-based logistics contract: profit-centric approach , 2008, J. Oper. Res. Soc..

[34]  Yu Tian,et al.  Optimizing reliability and service parts logistics for a time-varying installed base , 2012, Eur. J. Oper. Res..

[35]  Dragan Banjevic,et al.  Optimization models for critical spare parts inventories—a reliability approach , 2011, J. Oper. Res. Soc..

[36]  Rob A. Zuidwijk,et al.  On the use of installed base information for spare parts logistics: a revieuw of ideas and industry practice , 2010 .

[37]  Wenbin Wang,et al.  A stochastic model for joint spare parts inventory and planned maintenance optimisation , 2012, Eur. J. Oper. Res..

[38]  W. J. Kennedy,et al.  An overview of recent literature on spare parts inventories , 2002 .

[39]  Liliane Pintelon,et al.  The Effect of Maintenance Quality on Spare Parts Inventory for a Fleet of Assets , 2013, IEEE Transactions on Reliability.

[40]  Kamran Moinzadeh,et al.  Two-Parameter Approximations For Multi-Echelon Repairable Inventory Models With Batch Ordering Policy , 1987 .

[41]  P. Wang,et al.  Planning performance based contracts considering reliability and uncertain system usage , 2012, J. Oper. Res. Soc..