Development of a Multifunctional BIM Maturity Model
暂无分享,去创建一个
Xiaoling Zhang | Weisheng Lu | Cong Liang | Steve Rowlinson | Xiaoling Zhang | S. Rowlinson | Weisheng Lu | C. Liang
[1] Farzad Khosrowshahi,et al. Roadmap for implementation of BIM in the UK construction industry , 2012 .
[2] Benyamin Lichtenstein,et al. A Terminal Assessment of Stages Theory: Introducing a Dynamic States Approach to Entrepreneurship , 2010 .
[3] Petter Gottschalk,et al. Maturity levels for interoperability in digital government , 2009, Gov. Inf. Q..
[4] William R. King,et al. Integration Between Business Planning and Information Systems Planning: Validating a Stage Hypothesis , 1997 .
[5] Robert K. Kazanjian,et al. An empirical test of a stage of growth progression model , 1989 .
[6] Hazar Dib,et al. A measurement model of building information modelling maturity , 2014 .
[7] Rizal Sebastian,et al. Tool for Benchmarking BIM Performance of Design, Engineering and Construction Firms in The Netherlands , 2010 .
[8] Michael Rosemann,et al. Understanding the Main Phases of Developing a Maturity Assessment Model , 2005 .
[9] Bilal Succar,et al. Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .
[10] Phillip Dawson,et al. Assessment rubrics: towards clearer and more replicable design, research and practice , 2017 .
[11] Youngsoo Jung,et al. Building information modelling (BIM) framework for practical implementation , 2011 .