Controlling different flow rates in job-shop like production departments
暂无分享,去创建一个
Abstract We consider production departments where it is desirable that the production orders of different product types have different flow rates, independent of their production characteristics like processing times. Since flow rates are mainly determined by the work centre waiting times the product types should have different production order waiting times at the work centres. In this paper we derive a method which makes this possible in a controlled way: given certain values for some parameters the different waiting times (and thus the flow rates) are predictable. By means of simulation this method has been tested for two production situations where, per work centre, only two different flow rates are required. In the first situation both (categories of) products have the same average routing length, whereas in the second situation the average routing length for both (categories of) products differ. This simulation study shows that, using a simple balance equation and operation due date sequencing, it is possible to create different predictable flow rates. It turns out that up to a required waiting time reduction for one of the two (categories of) products of about 60% a one-to-one relation approximately exists between the scheduled (required) waiting time reduction and the what will be called, normalized waiting time reduction.
[1] Jack C. Hayya,et al. Priority dispatching with operation due dates in a job shop , 1982 .
[2] Ilias P. Tatsiopoulos,et al. Lead time management , 1983 .
[3] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[4] William L. Maxwell,et al. Theory of scheduling , 1967 .
[5] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .