Research of Risk Control of Public Construction Project Based on Fault Tree

According to characteristics of the project characteristics, fault tree analysis method is adopted and fault tree model is established to decompose the reasons that affect the project schedule layer by layer. Taking a dam construction project as an example, according to the degree of structural order, various factors are explored to calculate the degree of influence of the delay in progress, and the corresponding measures are proposed to control the schedule.