The study of labor productivity in the construction industry is gaining increasing attention as the industry faces multiple problems related to its workforce. This paper presents the results of a survey instrument applied to determine the relative level of relevance of construction labor productivity drivers and opportunities. Owners, general contractors, electrical contractors, mechanical contractors, consultants, and others participated in this survey. Management skills and manpower issues were identified as the two areas with the greatest potential to affect productivity according to survey respondents. Surprisingly, external factors, which are often cited as a major cause for reduced productivity in the construction industry, were considered to be one of the least relevant productivity drivers. These results suggest that respondents consider the improvement of labor productivity within their reach and control rather than determined by external conditions.
[1]
Ahmad Hadavi,et al.
Difficulties with Implementation of Goal Setting for Construction
,
1994
.
[2]
H. Randolph Thomas,et al.
Impact of Material Management on Productivity—A Case Study
,
1989
.
[3]
H. Randolph Thomas,et al.
Quantitative Effects of Construction Changes on Labor Productivity
,
1995
.
[4]
Gregory A. Howell,et al.
Interaction between subcycles: one key to improved methods
,
1993
.
[5]
Paul M. Goodrum,et al.
U.S. construction labor productivity trends, 1970-1998
,
2000
.
[6]
David W. Halligan,et al.
Action-Response Model and Loss of Productivity in Construction
,
1994
.
[7]
John Christian,et al.
Effects of Delay Times on Production Rates in Construction
,
1995
.
[8]
David R. Riley,et al.
Loss of Labor Productivity due to Delivery Methods and Weather
,
1999
.