A Review of IBS Malaysian Current and Future Study

Malaysia considers the construction industry as one of the main contributors for the country?s Gross Domestic Product (GDP) towards a developed country by 2020. In view of that, Malaysian Government proposed a new strategy through industrialization technology called Industrialized Building System (IBS). Although IBS was introduced since 40 years ago, with well- documented benefits and strong support from the Government, the pace of implementation and usage of IBS is still slow and below of the Government target. Current literature found out that investigation by many researchers mostly focusses on technical (hard) issues such as design structure, material testing and product development rather than on the studies related to management or soft issues, such as vendor development programs, readiness of practices, collaborative and integrated design, and supply chain processes. With regards to the challenge, this research is hoped to highlight issues pertaining on supply chain perspective towards the betterment of the IBS implementation in the Malaysian construction industry. Therefore, this paper will review the trend of Malaysian IBS in the current construction industry. Later on, followed by suggestions for the future work for more efficient and effective IBS implementation in Malaysia.

[1]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[2]  G. Howell,et al.  Integrated Project Delivery An Example Of Relational Contracting , 2005 .

[3]  Angela Lee,et al.  Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case , 2012 .

[4]  Mustafa Alshawi,et al.  BARRIERS TO INDUSTRIALIZED BUILDING SYSTEM ( IBS ) : THE CASE OF MALAYSIA , 2012 .

[5]  Jason D. Matthews,et al.  A project partnering approach to the main contractor–sub-contractor relationship , 1996 .

[6]  Angela Lee,et al.  Improving team integration in Malaysian IBS construction projects : a partnering approach , 2012 .

[7]  Hau L. Lee,et al.  Information sharing in a supply chain , 2000, Int. J. Manuf. Technol. Manag..

[8]  Chimay J. Anumba,et al.  An integrated framework for concurrent life-cycle design and construction , 1998 .

[9]  R. D. Buzzell,et al.  Channel Partnerships Streamline Distribution , 1995 .

[10]  Finland,et al.  Fast or concurrent: The art of getting construction improved , 1997 .

[11]  Jan Bröchner,et al.  Managing information flow in construction supply chains , 2005 .

[12]  Lauri Koskela,et al.  Roles of supply chain management in construction , 1999 .

[13]  John Bowron Re-engineering the project procurement process through concurrent engineering , 2002 .

[14]  Nuzul Azam Haron,et al.  Building Cost Comparison Between Conventional and Formwork System: A Case Study of Four-storey School Buildings in Malaysia , 2005 .

[15]  Salihudin Hassim,et al.  The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia , 2009 .

[16]  Mohd Sapuan Salit,et al.  THE EXPERIENCES OF MALAYSIA AND OTHER COUNTRIES IN INDUSTRIALISED BUILDING SYSTEM , 2022 .

[17]  Andrew R.J. Dainty,et al.  Subcontractor perspectives on supply chain alliances , 2001 .

[18]  M. Swainston,et al.  Early contractor involvement , 2006 .

[19]  Kate Barker,et al.  Review of Housing Supply , 2004 .

[20]  Albert P.C. Chan,et al.  An empirical study of the benefits of construction partnering in Hong Kong , 2003 .

[21]  Mahanim Hanid,et al.  A Literature Review Of The Advantages And Barriers To The Implementation Of Industrialised Building System (IBS) In Construction Industry. , 2009 .

[22]  A. Akintoye,et al.  A survey of supply chain collaboration and management in the UK construction industry , 2000 .

[23]  Angela Lee The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process , 2002 .

[24]  Angela Lee,et al.  A critical literature review on the concept of team integration in Industrialised Building System (IBS) project , 2011 .

[25]  Ron Wakefield,et al.  Drivers, constraints and the future of offsite manufacture in Australia , 2007 .

[26]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[27]  P McDermott,et al.  Integration of suppliers and manufacturers through innovative procurement , 2009 .

[28]  Chimay J. Anumba,et al.  Establishing and processing client requirements—a key aspect of concurrent engineering in construction , 2000 .