Treatment design of geological defects in dam foundation of Jinping I hydropower station
暂无分享,去创建一个
Hongling Rao | Shengwu Song | Feng Xuemin | Zheng Hanhuai | H. Rao | Shengwu Song | Feng Xuemin | Zheng Hanhuai
[1] Xia-Ting Feng,et al. Stability assessment of the Three-Gorges Dam foundation, China, using physical and numerical modeling—Part I: physical model tests , 2003 .
[2] Shengwu Song,et al. Safety monitoring and stability analysis of left abutment slope of Jinping I hydropower station , 2011 .
[3] Hu Shuhong. TREATMENT OF HIGH AND STEEP SLOPES WITH COMPLICATED GEOLOGICAL CONDITIONS AT LEFT ABUTMENT OF JINPING I HYDROPOWER STATION , 2012 .
[4] Hu Chengqiu,et al. EXPERIMENTAL STUDY ON GLOBAL GEOMECHANICAL MODEL FOR STABILITY ANALYSIS OF HIGH ARCH DAM FOUNDATION AND ABUTMENT , 2005 .
[5] Sun Shao-wen. Research on physical model test for high arch dam of Jinping I Hydropower Station , 2009 .
[6] Feng Xuemin. STABILITY ANALYSIS AND REINFORCEMENT DESIGN OF HIGH AND STEEP SLOPES WITH COMPLEX GEOLOGY IN ABUTMENT OF JINPING I HYDROPOWER STATION , 2010 .
[7] A. A. Varga. The main problems of evaluation of geological structure in dam construction , 1979 .
[8] Yu Xi-jun,et al. Design of consolidation grouting and treatment of geological defects for the foundation of the Three Gorges Dam , 2004 .
[9] Liu Rong-li. Study on Jinping I Arch Dam Left Abutment Foundation Treatment , 2009 .
[10] Hu Zhu-xiu. Analysis of stress and deformation of Jinping I High Arch Dam after foundation reinforcement , 2010 .
[11] Faquan Wu,et al. Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station , 2004 .