Project Planning with Alternative Technologies in Uncertain Environments
暂无分享,去创建一个
[1] Daniel Granot,et al. Optimal Sequencing and Resource Allocation in Research and Development Projects , 1991 .
[2] Fabrice Talla Nobibon,et al. A fast greedy heuristic for scheduling modular projects , 2014, Journal of Heuristics.
[3] J. Christopher Beck,et al. Constraint-directed techniques for scheduling alternative activities , 2000, Artif. Intell..
[4] Frederik Stork,et al. Stochastic resource-constrained project scheduling , 2001 .
[5] Roman Barták,et al. Temporal Reasoning in Nested Temporal Networks with Alternatives , 2008, CSCLP.
[6] Elsayed A. Elsayed,et al. Job shop scheduling with alternative machines , 1990 .
[7] Joseph G. Szmerekovsky,et al. Scheduling projects with stochastic activity duration to maximize expected net present value , 2009, Eur. J. Oper. Res..
[8] Jane N. Hagstrom,et al. Computational complexity of PERT problems , 1988, Networks.
[9] Robert P. Smith,et al. A model-based method for organizing tasks in product development , 1994 .
[10] Young H. Chun,et al. Sequential decisions under uncertainty in the R&D project selection problem , 1994 .
[11] M. Weitzman. Optimal search for the best alternative , 1978 .
[12] Franz Josef Radermacher,et al. Preselective strategies for the optimization of stochastic project networks under resource constraints , 1983, Networks.
[13] Yigal Gerchak,et al. On the allocation of uncertainty-reduction effort to minimize total variability , 2000 .
[14] Sylvain Lenfle,et al. The strategy of parallel approaches in projects with unforeseeable uncertainty: the Manhattan case in retrospect , 2011 .
[15] Vidyadhar G. Kulkarni,et al. A classified bibliography of research on stochastic PERT networks: 1966-1987 , 1989 .
[16] A. R. Klingel,et al. Bias in Pert Project Completion Time Calculations for a Real Network , 1966 .
[17] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[18] Tonguç Ünlüyurt,et al. Sequential testing of complex systems: a review , 2004, Discret. Appl. Math..
[19] Grzegorz Malewicz,et al. Parallel scheduling of complex dags under uncertainty , 2005, SPAA '05.
[20] Christoph H. Loch,et al. Managing the Unknown: A New Approach to Managing High Uncertainty and Risk in Projects , 2006 .
[21] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[22] Ely Dahan,et al. Reducing Technical Uncertainty in Product and Process Reducing Technical Uncertainty in Product and Process Development Through Parallel Design of Prototypes Development Through Parallel Design of Prototypes , 1998 .
[23] William J. Abernathy,et al. Parallel Strategies in Development Projects , 1969 .
[24] Martin L. Puterman,et al. Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .
[25] Rolf H. Möhring,et al. Scheduling under uncertainty: Optimizing against a randomizing adversary , 2000, APPROX.
[26] Ming Ding,et al. Structuring the New Product Development Pipeline , 2002, Manag. Sci..
[27] I Ben-David,et al. An integrated approach for risk response development in project planning , 2001, J. Oper. Res. Soc..
[28] John C. Gittins,et al. Models and software for improving the profitability of pharmaceutical research , 2008, Eur. J. Oper. Res..
[29] Fabrice Talla Nobibon,et al. Scheduling modular projects on a bottleneck resource , 2014, J. Sched..
[30] Meir J. Rosenblatt,et al. Activity Delay in Stochastic Project Networks , 1997, Oper. Res..
[31] Vipul Jain,et al. Resource-Constrained Scheduling of Tests in New Product Development , 1999 .
[32] Rolf H. Möhring,et al. A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks , 2001, Ann. Oper. Res..
[33] Warren B. Powell,et al. What you should know about approximate dynamic programming , 2009, Naval Research Logistics (NRL).
[34] Rolf H. Möhring,et al. Scheduling under Uncertainty: Bounding the Makespan Distribution , 2001, Computational Discrete Mathematics.
[35] Reza H. Ahmadi,et al. Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..
[36] Vidyadhar G. Kulkarni,et al. Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..
[37] Ignacio E. Grossmann,et al. Optimization Models for the Scheduling of Testing Tasks in New Product Development , 1996 .
[38] Stefan Creemers,et al. A Markov Model for Measuring Service Levels in Nonstationary G(t)/G(t)/s(t)+G(t) Queues , 2013 .
[39] Grzegorz Malewicz,et al. Implementation and Experiments with an Algorithm for Parallel Scheduling of Complex Dags under Uncertainty , 2006, ALENEX.
[40] Masao Mori,et al. A RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH REATTEMPT AT FAILURE : A HEURISTIC APPROACH , 1997 .
[41] Roel Leus,et al. R&D project scheduling when activities may fail , 2007 .
[42] Marc Lambrecht,et al. Scheduling Markovian PERT networks to maximize the net present value , 2010, Oper. Res. Lett..
[43] Roman Barták,et al. Temporal Networks with Alternatives: Complexity and Model , 2007, FLAIRS.
[44] Stefano Benati,et al. An Optimization Model for Stochastic Project Networks with Cash Flows , 2006, Comput. Manag. Sci..
[45] Chris Chapman,et al. Transforming project risk management into project uncertainty management , 2003 .
[46] Mor Harchol-Balter,et al. Analysis of multi-server systems via dimensionality reduction of markov chains , 2005 .
[47] Kim B. Clark,et al. Design Rules: The Power of Modularity , 2000 .
[48] Christoph H. Loch,et al. Parallel and Sequential Testing of Design Alternatives , 2001, Manag. Sci..
[49] R. Nelson. Uncertainty, Learning, and the Economics of Parallel Research and Development Efforts , 1961 .
[50] Christoph H. Loch,et al. Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty , 2004, Manag. Sci..
[51] Karlos Artto,et al. What is project strategy , 2007 .
[52] Andrew Kusiak,et al. Scheduling with alternative operations , 1993, IEEE Trans. Robotics Autom..
[53] Marcel F. Neuts,et al. Matrix-Geometric Solutions in Stochastic Models , 1981 .
[54] Jiun-Yu Yu,et al. Software for managing the risks and improving the profitability of pharmaceutical research , 2007 .
[55] Ely Dahan,et al. Reducing Technical Uncertainty in Product and Process Development Through Parallel Design of Prototypes , 1999 .
[56] Gerd Finke,et al. Selection of process plans in automated manufacturing systems , 1988, IEEE J. Robotics Autom..
[57] J.-S. Chen,et al. Scheduling alternative operations in two-machine flow-shops , 1997 .
[58] Erik Demeulemeester,et al. Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..