Scheduling-free resource management
暂无分享,去创建一个
Kees M. van Hee | Natalia Sidorova | Alexander Serebrenik | Marc Voorhoeve | Jan van der Wal | J. Wal | K. V. Hee | M. Voorhoeve | N. Sidorova | Alexander Serebrenik
[1] Javier Martínez,et al. A Petri net based deadlock prevention policy for flexible manufacturing systems , 1995, IEEE Trans. Robotics Autom..
[2] Wil M. P. van der Aalst,et al. Workflow Verification: Finding Control-Flow Errors Using Petri-Net-Based Techniques , 2000, Business Process Management.
[3] Manuel Silva Suárez,et al. Petri nets and flexible manufacturing , 1988, European Workshop on Applications and Theory in Petri Nets.
[4] Rüdiger Valk,et al. Petri Nets for Systems Engineering , 2003, Springer Berlin Heidelberg.
[5] Wil M. P. van der Aalst,et al. The Application of Petri Nets to Workflow Management , 1998, J. Circuits Syst. Comput..
[6] R. S. Laundy,et al. Multiple Criteria Optimisation: Theory, Computation and Application , 1989 .
[7] Martin L. Puterman,et al. Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .
[8] Manuel Silva Suárez,et al. Petri Nets for the Design and Operation of Manufacturing Systems , 1997, Eur. J. Control.
[9] Jwm Will Bertrand,et al. Production Control: A Structural and Design Oriented Approach , 1990 .
[10] Theodor J. Stewart,et al. Multiple criteria decision analysis - an integrated approach , 2001 .
[11] Kees M. van Hee,et al. Workflow Management: Models, Methods, and Systems , 2002, Cooperative information systems.
[12] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[13] Wil M. P. van der Aalst,et al. Verification of Workflow Nets , 1997, ICATPN.
[14] Kees M. van Hee,et al. The Price of Coordination in Resource Management , 2005, Business Process Management.
[15] J. K. Lenstra,et al. Local Search in Combinatorial Optimisation. , 1997 .
[16] J. Fzpeleta. Flexible Manufacturing Systems , 2003 .
[17] Kees M. van Hee,et al. Soundness of Resource-Constrained Workflow Nets , 2005, ICATPN.
[18] Vineet Kahlon,et al. Model Checking Large-Scale and Parameterized Resource Allocation Systems , 2002, TACAS.
[19] Wil vanderAalst,et al. Workflow Management: Models, Methods, and Systems , 2004 .
[20] José Manuel Colom,et al. The Resource Allocation Problem in Flexible Manufacturing Systems , 2003, ICATPN.
[21] Ahmed Bouajjani,et al. Verification of Parametric Concurrent Systems with Prioritized FIFO Resource Management , 2003, CONCUR.