Multi-agent-based proactive–reactive scheduling for a job shop
暂无分享,去创建一个
[1] J. Christopher Beck,et al. Slack-based Techniques for Robust Schedules , 2014 .
[2] Stefan Biffl,et al. Investigating the robustness of re-scheduling policies with multi-agent system simulation , 2011 .
[3] Paolo Renna,et al. Multi-agent based scheduling in manufacturing cells in a dynamic environment , 2011 .
[4] Paulo Leitão,et al. A holonic disturbance management architecture for flexible manufacturing systems , 2011 .
[5] Shih-Chang Wang,et al. An agent-based evolutionary strategic negotiation for project dynamic scheduling , 2007 .
[6] Han-Pang Huang,et al. A REAL-TIME SCHEDULING AND RESCHEDULING SYSTEM BASED ON RFID FOR SEMICONDUCTOR FOUNDRY FABS , 2007 .
[7] D. Petrovic,et al. A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions , 2006, Fuzzy Sets Syst..
[8] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[9] Chris N. Potts,et al. Rescheduling for New Orders , 2004, Oper. Res..
[10] Can Saygin,et al. Auction-based distributed scheduling and control scheme for flexible manufacturing systems , 2004 .
[11] Joseph Y.-T. Leung,et al. A note on scheduling parallel machines subject to breakdown and repair , 2004 .
[12] Sanjay B. Joshi,et al. Auction-based distributed scheduling in a dynamic job shop environment , 2002 .
[13] Robert W. Brennan,et al. Evaluating the performance of reactive control architectures for manufacturing production control , 2001, Comput. Ind..
[14] Thierry Coudert,et al. Reactive scheduling using a multi-agent model: the SCEP framework , 2001 .
[15] George Chryssolouris,et al. Dynamic scheduling of manufacturing job shops using genetic algorithms , 2001, J. Intell. Manuf..
[16] Manolis A. Christodoulou,et al. Application of a neural-network scheduler on a real manufacturing system , 2001, IEEE Trans. Control. Syst. Technol..
[17] Jaime Cerdá,et al. Knowledge-based predictive and reactive scheduling in industrial environments , 2000 .
[18] Weiming Shen,et al. Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing , 2000 .
[19] Andrea Rossi,et al. Dynamic scheduling of FMS using a real-time genetic algorithm , 2000 .
[20] T. Dean,et al. Decision-Theoretic Planning: Structural Assumptions and Computational Leverage , 1999, J. Artif. Intell. Res..
[21] Djamila Ouelhadj,et al. A multi-contract net protocol for dynamic scheduling in flexible manufacturing systems (FMS) , 1999, Proceedings 1999 IEEE International Conference on Robotics and Automation (Cat. No.99CH36288C).
[22] Yeong-Dae Kim,et al. A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules , 1998 .
[23] Reha Uzsoy,et al. Predictable scheduling of a job shop subject to breakdowns , 1998, IEEE Trans. Robotics Autom..
[24] Ihsan Sabuncuoglu,et al. A STUDY OF SCHEDULING RULES OF FLEXIBLE MANUFACTURING SYSTEMS : A SIMULATION APPROACH , 1998 .
[25] R. L. Daniels,et al. β-Robust scheduling for single-machine systems with uncertain processing times , 1997 .
[26] Kyo-Il Lee,et al. An intelligent operations scheduling system in a job shop , 1996 .
[27] Jürgen Dorn,et al. Reactive scheduling: improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning , 1995, Int. J. Hum. Comput. Stud..
[28] John L. Bresina,et al. Just-In-Case Scheduling , 1994, AAAI.
[29] Michael Pinedo. Scheduling: Theory, Algorithms, and Systems , 1994 .
[30] George Rzevski,et al. Magenta Multi-Agent Systems for Dynamic Scheduling , 2009, ICAART.
[31] Sanja Petrovic,et al. SURVEY OF DYNAMIC SCHEDULING IN MANUFACTURING SYSTEMS , 2006 .
[32] Mohamed Ali Aloulou,et al. An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances , 2005 .
[33] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[34] H. Van Dyke Parunak,et al. The AARIA agent architecture: From manufacturing requirements to agent-based system design , 2001, Integr. Comput. Aided Eng..
[35] Robert H. Storer,et al. A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness , 1999, Oper. Res..
[36] Oliver Holthaus,et al. Scheduling in job shops with machine breakdowns: an experimental study , 1999 .
[37] Daniel Mosse,et al. Guaranteeing fault tolerance through scheduling in real-time systems , 1996 .
[38] Kazuo Miyashita,et al. Case-based knowledge acquisition for schedule optimization , 1995, Artif. Intell. Eng..
[39] Elizabeth Szelke,et al. Artificial Intelligence in Reactive Scheduling , 1995, IFIP Advances in Information and Communication Technology.