Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
暂无分享,去创建一个
E.L. Lawler | R.L. Graham | J.K. Lenstra | A.H.G.Rinnooy Kan | R. Graham | E. Lawler | J. Lenstra | A. Kan
[1] Marc T. Kaufman. Anomalies in scheduling unit-time tasks. , 1972 .
[2] Ronald L. Graham,et al. Performance Guarantees for Scheduling Algorithms , 1978, Oper. Res..
[3] Edward G. Coffman,et al. Optimal Preemptive Scheduling on Two-Processor Systems , 1969, IEEE Transactions on Computers.
[4] J. Piehler,et al. Ein Beitrag zum Reihenfolgeproblem , 1960, Unternehmensforschung.
[5] L. G. Mitten. Sequencing n Jobs on Two Machines with Arbitrary Time Lags , 1959 .
[6] M. T. Kaufman,et al. An Almost-Optimal Algorithm for the Assembly Line Scheduling Problem , 1974, IEEE Transactions on Computers.
[7] Jane W.-S. Liu,et al. Bounds on Scheduling Algorithms for Heterogeneous Comnputing Systems , 1974, IFIP Congress.
[8] Kenneth R. Baker,et al. Sequencing with due-dates and early start times to minimize maximum tardiness , 1974 .
[9] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[10] W. Szwarc. Elimination methods in the m × n sequencing problem , 1971 .
[11] Edward G. Coffman,et al. Preemptive Scheduling of Real-Time Tasks on Multiprocessor Systems , 1970, JACM.
[12] E. Lawler. A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness , 1977 .
[13] Edward G. Coffman,et al. An Application of Bin-Packing to Multiprocessor Scheduling , 1978, SIAM J. Comput..
[14] Ellis Horowitz,et al. Exact and Approximate Algorithms for Scheduling Nonidentical Processors , 1976, JACM.
[15] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[16] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[17] Linus Schrage,et al. Finding an Optimal Sequence by Dynamic Programming: An Extension to Precedence-Related Tasks , 1978, Oper. Res..
[18] David S. Johnson,et al. Scheduling Equal-Length Tasks Under Treelike Precedence Constraints to Minimize Maximum Lateness , 1977, Math. Oper. Res..
[19] Oscar H. Ibarra,et al. On Two—Processor Scheduling of One— or Two—Unit Time Tasks with Precedence Constraints , 1975 .
[20] David S. Johnson,et al. Fast Algorithms for Bin Packing , 1974, J. Comput. Syst. Sci..
[21] John M. Charlton,et al. A Generalized Machine-Scheduling Algorithm , 1970 .
[22] Ravi Sethi,et al. On the Complexity of Mean Flow Time Scheduling , 1977, Math. Oper. Res..
[23] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[24] Dennis G. Kafura,et al. An Algorithm to Design the Memory Configuration of a Computer Network , 1978, JACM.
[25] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[26] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[27] Alfred V. Aho,et al. The Transitive Reduction of a Directed Graph , 1972, SIAM J. Comput..
[28] Andrew Chi-Chih Yao,et al. Resource Constrained Scheduling as Generalized Bin Packing , 1976, J. Comb. Theory A.
[29] Jan Karel Lenstra,et al. Some Simple Applications of the Travelling Salesman Problem , 1975 .
[30] T. C. Hu. Parallel Sequencing and Assembly Line Problems , 1961 .
[31] Robert McNaughton,et al. Scheduling with Deadlines and Loss Functions , 1959 .
[32] Eugene L. Lawler,et al. Preemptive scheduling of uniform machines subject to release dates : (preprint) , 1979 .
[33] David S. Johnson,et al. Complexity Results for Multiprocessor Scheduling under Resource Constraints , 1975, SIAM J. Comput..
[34] Toshihide Ibaraki,et al. A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times , 1978, Oper. Res..
[35] B. J. Lageweg,et al. Minimizing Total Costs in One-Machine Scheduling , 1975, Oper. Res..
[36] Shimon Even,et al. Bounds for the Optimal Scheduling of n Jobs on m Processors , 1964 .
[37] Jeffrey D. Ullman,et al. NP-Complete Scheduling Problems , 1975, J. Comput. Syst. Sci..
[38] Wlodzimierz Szwarc. Optimal Elimination Methods in the m × n Flow-Shop Scheduling Problem , 1973, Oper. Res..
[39] Pierre N. Robillard,et al. Scheduling with earliest start and due date constraints on multiple machines , 1975 .
[40] K. R. Baker,et al. Minimizing Mean Flowtime in the Flow Shop with No Intermediate Queues , 1974 .
[41] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[42] B. J. Lageweg,et al. A General Bounding Scheme for the Permutation Flow-Shop Problem , 1978, Oper. Res..
[43] W. A. Horn. Technical Note - Minimizing Average Flow Time with Parallel Machines , 1973, Oper. Res..
[44] E. Ignall,et al. Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems , 1965 .
[45] David S. Johnson,et al. Near-optimal bin packing algorithms , 1973 .
[46] Jan Karel Lenstra,et al. Complexity of Scheduling under Precedence Constraints , 1978, Oper. Res..
[47] Kenneth R. Baker,et al. Scheduling with parallel processors and linear delay costs , 1973 .
[48] Edward G. Coffman,et al. Scheduling independent tasks to reduce mean finishing time , 1974, CACM.
[49] Oscar H. Ibarra,et al. Heuristic Algorithms for Scheduling Independent Tasks on Nonidentical Processors , 1977, JACM.
[50] Michael H. Rothkopf,et al. Scheduling Independent Tasks on Parallel Processors , 1966 .
[51] G. Thompson,et al. Algorithms for Solving Production-Scheduling Problems , 1960 .
[52] D. Adolphson. Optimal linear-ordering. , 1973 .
[53] J. Lenstra,et al. Job-Shop Scheduling by Implicit Enumeration , 1977 .
[54] Sartaj Sahni,et al. Algorithms for Scheduling Independent Tasks , 1976, J. ACM.
[55] James E. Day,et al. Review of sequencing research , 1970 .
[56] Peter J. Denning,et al. A note on sub-expression ordering in the execution of arithmetic expressions , 1973, CACM.
[57] J. M. Moore,et al. A Functional Equation and its Application to Resource Allocation and Sequencing Problems , 1969 .
[58] Graham McMahon,et al. On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness , 1975, Oper. Res..
[59] W. A. Horn. Some simple scheduling algorithms , 1974 .
[60] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.
[61] Donald L. Adolphson,et al. Single Machine Job Sequencing with Precedence Constraints , 1977, SIAM J. Comput..
[62] Shui Lam,et al. A Level Algorithm for Preemptive Scheduling , 1977, J. ACM.
[63] Clyde L. Monma,et al. A general algorithm for optimal job sequencing with series-parallel precedence constraints , 1977 .
[64] Ludo Gelders,et al. Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II - Computation and Structure , 1975, Oper. Res..
[65] Richard M. Karp,et al. On the Computational Complexity of Combinatorial Problems , 1975, Networks.
[66] Oscar H. Ibarra,et al. Bounds for LPT Schedules on Uniform Processors , 1977, SIAM J. Comput..
[67] M. Fujii,et al. Optimal Sequencing of Two Equivalent Processors , 1969 .
[68] L. Gelders,et al. Coordinating Aggregate and Detailed Scheduling Decisions in the One-Machine Job Shop: Part I. Theory , 2015, Oper. Res..
[69] David S. Johnson,et al. Two-Processor Scheduling with Start-Times and Deadlines , 1977, SIAM J. Comput..
[70] Marshall L. Fisher,et al. Optimal Solution of Scheduling Problems Using Lagrange Multipliers: Part I , 1973, Oper. Res..
[71] Ravi Sethi,et al. Scheduling Graphs on Two Processors , 1976, SIAM J. Comput..
[72] W. A. Horn. Single-Machine Job Sequencing with Treelike Precedence Ordering and Linear Delay Penalties , 1972 .
[73] David S. Johnson,et al. Approximation algorithms for combinatorial problems: an annotated bibliography , 1976 .
[74] C. V. Ramamoorthy,et al. On the Flow-Shop Sequencing Problem with No Wait in Process † , 1972 .
[75] Chak-Kuen Wong,et al. Worst-Case Analysis of a Placement Algorithm Related to Storage Allocation , 1975, SIAM J. Comput..
[76] J. K. Lenstra,et al. Computational complexity of discrete optimization problems , 1977 .
[77] Teofilo F. Gonzalez,et al. Preemptive Scheduling of Uniform Processor Systems , 1978, JACM.
[78] C. L. Liu,et al. Optimal Scheduling on Multi-Processor Computing Systems , 1972, SWAT.
[79] Marshall L. Fisher,et al. A dual algorithm for the one-machine scheduling problem , 1976, Math. Program..
[80] Herb Schwetman,et al. Analysis of Several Task-Scheduling Algorithms for a Model of Multiprogramming Computer Systems , 1975, JACM.
[81] N. Hsu. Elementary proof of Hu’s theorem on isotone mappings , 1966 .
[82] William S. Gere. Heuristics in Job Shop Scheduling , 1966 .
[83] W. Townsend. A Branch-and-Bound Method for Sequencing Problems with Linear and Exponential Penalty Functions , 1977 .
[84] E. Lawler. Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints , 1978 .
[85] J. J. Brennan,et al. An Improved Algorithm for Scheduling Jobs on Identical Machines , 1977 .
[86] W. Townsend. Note---Sequencing n Jobs on m Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution , 1977 .
[87] Ronald L. Graham,et al. Bounds for certain multiprocessing anomalies , 1966 .
[88] Selmer Martin Johnson,et al. Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags , 1959 .
[89] James R. Jackson,et al. An extension of Johnson's results on job IDT scheduling , 1956 .
[90] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[91] B. J. Lageweg,et al. Minimizing maximum lateness on one machine : Computational experience and some applications , 1976 .
[92] David S. Johnson,et al. Scheduling Tasks with Nonuniform Deadlines on Two Processors , 1976, J. ACM.
[93] Salah E. Elmaghraby,et al. On the Scheduling of Jobs on a Number of Identical Machines. , 1972 .
[94] D. G. KAFURA,et al. Task Scheduling on a Multiprocessor System with Independent Memories , 1977, SIAM J. Comput..
[95] Teofilo F. Gonzalez,et al. A Note on Open Shop Preemptive Schedules , 1979, IEEE Transactions on Computers.
[96] Ronald L. Graham,et al. Bounds on Multiprocessing Timing Anomalies , 1969, SIAM Journal of Applied Mathematics.
[97] Shui Lam,et al. Worst Case Analysis of Two Scheduling Algorithms , 1977, SIAM J. Comput..
[98] Eugene L. Lawler,et al. Optimal Sequencing of a Single Machine Subject to Precedence Constraints , 1973 .
[99] D. A. Wismer,et al. Solution of the Flowshop-Scheduling Problem with No Intermediate Queues , 1972, Oper. Res..
[100] Yoichi Muraoka,et al. Parallelism exposure and exploitation in programs , 1971 .
[101] Jeffrey D. Ullman,et al. Worst-Case Performance Bounds for Simple One-Dimensional Packing Algorithms , 1974, SIAM J. Comput..
[102] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..
[103] Jeffrey B. Sidney,et al. Decomposition Algorithms for Single-Machine Sequencing with Precedence Relations and Deferral Costs , 1975, Oper. Res..
[104] Eugene L. Lawler,et al. On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming , 1978, JACM.
[105] Wlodzimierz Szwarc. Technical Note - Dominance Conditions for the Three-Machine Flow-Shop Problem , 1978, Oper. Res..
[106] Jatinder N. D. Gupta,et al. Technical Note - Improved Dominance Conditions for the Three-Machine Flowshop Scheduling Problem , 1978, Oper. Res..
[107] Ronald L. Graham,et al. Bounds for Multiprocessor Scheduling with Resource Constraints , 1975, SIAM J. Comput..
[108] Wlodzimierz Szwarc. On some sequencing problems , 1968 .
[109] C. L. Liu,et al. On a Class of Scheduling Algorithms for Multiprocessors Computing Systems , 1974, Sagamore Computer Conference.