Approaches to a real-world train timetabling problem in a railway node

We consider the Train Timetabling Problem (TTP) in a railway node (i.e. a set of stations in an urban area interconnected by tracks), which calls for determining the best schedule for a given set of trains during a given time horizon, while satisfying several track operational constraints. In particular, we consider the context of a highly congested railway node in which different Train Operators wish to run trains according to timetables that they propose, called ideal timetables. The ideal timetables altogether may be (and usually are) conflicting, i.e. they do not respect one or more of the track operational constraints. The goal is to determine conflict-free timetables that differ as little as possible from the ideal ones.

[1]  Thomas Schlechte,et al.  A direct comparison of physical block occupancy versus timed block occupancy in train timetabling formulations , 2013 .

[2]  Fabio Furini,et al.  A fast heuristic approach for train timetabling in a railway node , 2013, Electron. Notes Discret. Math..

[3]  Dennis Huisman,et al.  Delay Management with Rerouting of Passengers , 2012, Transp. Sci..

[4]  Lucas P. Veelenturf,et al.  An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .

[5]  Jacques Desrosiers,et al.  Time Constrained Routing and Scheduling , 1992 .

[6]  Ravindra K. Ahuja,et al.  Network Flows: Theory, Algorithms, and Applications , 1993 .

[7]  Rolf H. Möhring,et al.  The Modeling Power of the Periodic Event Scheduling Problem: Railway Timetables - and Beyond , 2004, ATMOS.

[8]  Paolo Toth,et al.  A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..

[9]  Erhan Kozan,et al.  Techniques for absolute capacity determination in railways , 2006 .

[10]  X. Cai,et al.  A fast heuristic for the train scheduling problem , 1994, Comput. Oper. Res..

[11]  Johanna Törnquist Krasemann Design of an Effective Algorithm for Fast Response to the Rescheduling of Railway Traffic During Disturbances , 2012 .

[12]  Paolo Toth,et al.  Non-cyclic train timetabling and comparability graphs , 2010, Oper. Res. Lett..

[13]  Miguel A. Salido,et al.  An Assessment of Railway Capacity , 2008 .

[14]  Patrick T. Harker,et al.  Tactical Scheduling of Rail Operations: The SCAN I System , 1991, Transp. Sci..

[15]  Thomas Schlechte Railway Track Allocation , 2012, OR.

[16]  Erhan Kozan,et al.  Heuristic Techniques for Single Line Train Scheduling , 1997, J. Heuristics.

[17]  Matthias Ehrgott,et al.  A set packing inspired method for real-time junction train routing , 2013, Comput. Oper. Res..

[18]  Leo Kroon,et al.  Routing trains through railway stations: complexity issues , 1997 .

[19]  Michiel A. Odijk,et al.  A CONSTRAINT GENERATION ALGORITHM FOR THE CONSTRUCTION OF PERIODIC RAILWAY TIMETABLES , 1996 .

[20]  Paolo Toth,et al.  Optimization Problems in Passenger Railway Systems , 2011 .

[21]  Paolo Toth,et al.  A Lagrangian heuristic algorithm for a real-world train timetabling problem , 2006, Discret. Appl. Math..

[22]  Dario Pacciarelli,et al.  Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time , 2008, Transp. Sci..

[23]  Matteo Fischetti,et al.  Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..

[24]  B Szpigel,et al.  OPTIMAL TRAIN SCHEDULING ON A SINGLE LINE RAILWAY , 1973 .

[25]  Ralf Borndörfer,et al.  Optimizing the Simplon railway corridor , 2014, Ann. Oper. Res..

[26]  Dennis Huisman,et al.  Operations Research in passenger railway transportation , 2005 .

[27]  Paolo Toth,et al.  Chapter 3 Passenger Railway Optimization , 2007, Transportation.

[28]  Dario Pacciarelli,et al.  A branch and bound algorithm for scheduling trains in a railway network , 2007, Eur. J. Oper. Res..

[29]  Ming-Miin Yu,et al.  Efficiency and effectiveness in railway performance using a multi-activity network DEA model , 2008 .

[30]  Walter Ukovich,et al.  A Mathematical Model for Periodic Scheduling Problems , 1989, SIAM J. Discret. Math..

[31]  Christian Liebchen,et al.  Performance of Algorithms for Periodic Timetable Optimization , 2008 .

[32]  Dennis Huisman,et al.  The New Dutch Timetable: The OR Revolution , 2008, Interfaces.

[33]  Luis Cadarso,et al.  Recovery of disruptions in rapid transit networks , 2013 .

[34]  Uwe T. Zimmermann,et al.  Cost optimal periodic train scheduling , 2005, Math. Methods Oper. Res..

[35]  Per Olov Lindberg,et al.  Railway Timetabling Using Lagrangian Relaxation , 1998, Transp. Sci..

[36]  George L. Nemhauser,et al.  Handbooks in operations research and management science , 1989 .

[37]  Alberto Caprara Almost 20 Years of Combinatorial Optimization for Railway Planning: from Lagrangian Relaxation to Column Generation , 2010, ATMOS.

[38]  Malachy Carey,et al.  A Model, Algorithms and Strategy for Train Pathing , 1995 .

[39]  Leo Kroon,et al.  A Cycle Based Optimization Model for the Cyclic Railway Timetabling Problem , 2001 .

[40]  Paolo Toth,et al.  Scheduling extra freight trains on railway networks , 2010 .

[41]  Paolo Toth,et al.  Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..

[42]  Dario Pacciarelli,et al.  Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..

[43]  Xavier Gandibleux,et al.  Heuristics for railway infrastructure saturation , 2001, ATMOS.

[44]  Marco Laumanns,et al.  A model predictive control approach for discrete-time rescheduling in complex central railway station areas , 2012, Comput. Oper. Res..

[45]  Karl Nachtigall,et al.  A genetic algorithm approach to periodic railway synchronization , 1996, Comput. Oper. Res..

[46]  Carlo Mannino,et al.  Optimal Real-Time Traffic Control in Metro Stations , 2009, Oper. Res..

[47]  Matthias Ehrgott,et al.  Railway track allocation: models and methods , 2011, OR Spectr..

[48]  Leon W P Peeters,et al.  Cyclic Railway Timetable Optimization , 2003 .

[49]  Xiang Li,et al.  Optimizing trains movement on a railway network , 2012 .

[50]  Lucas P. Veelenturf,et al.  An Overview of Recovery Models for Real-time Railway Rescheduling , 2013 .

[51]  Paolo Toth,et al.  A column generation approach to train timetabling on a corridor , 2008, 4OR.

[52]  Justo Puerto,et al.  Expanding the Spanish high-speed railway network , 2011 .