Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach
暂无分享,去创建一个
Chengbin Chu | Ada Che | Jianguang Feng | A. Che | C. Chu | Jianguang Feng
[1] Eugene Levner,et al. On-line scheduling in a surface treatment system , 2000, Eur. J. Oper. Res..
[2] Qiang Xu,et al. Production-ratio oriented optimization for multi-recipe material handling via simultaneous hoist scheduling and production line arrangement , 2013, Comput. Chem. Eng..
[3] Ada Che,et al. Bi-objective cyclic scheduling in a robotic cell with processing time windows and non-Euclidean travel times , 2014 .
[4] Krzysztof Fleszar,et al. A constraint propagation heuristic for the single-hoist, multiple-products scheduling problem , 2004, Comput. Ind. Eng..
[5] Zelda B. Zabinsky,et al. An algorithm for scheduling a chemical processing tank line , 1993 .
[6] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[7] Mohamed Benrejeb,et al. Resolution of the two-part cyclic hoist scheduling problem with bounded processing times in complex lines’ configuration , 2012 .
[8] T. C. Edwin Cheng,et al. Complexity of cyclic scheduling problems: A state-of-the-art survey , 2010, Comput. Ind. Eng..
[9] Michael Pinedo,et al. Current trends in deterministic scheduling , 1997, Ann. Oper. Res..
[10] Guoqing Zhang,et al. Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence , 2003, IEEE Trans. Robotics Autom..
[11] Pierre Baptiste,et al. Constraint-based model for the cyclic multi-hoists scheduling problem , 2000 .
[12] Eugene Levner,et al. Cyclic routing algorithms in graphs: Performance analysis and applications to robot scheduling , 2011, Comput. Ind. Eng..
[13] Sameh Chtourou,et al. A hybrid algorithm for the cyclic hoist scheduling problem with two transportation resources , 2013, Comput. Ind. Eng..
[14] W. C. Ng. Determining the optimal number of duplicated process tanks in a single-hoist circuit board production line , 1995 .
[15] W. Ng. A branch and bound algorithm for hoist scheduling of a circuit board production line , 1996 .
[16] Pengyu Yan,et al. A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem , 2012 .
[17] Marie-Ange Manier,et al. Hoist Scheduling Problem. , 2008 .
[18] Chengbin Chu,et al. Robust optimization for the cyclic hoist scheduling problem , 2015, Eur. J. Oper. Res..
[19] Eugene Levner,et al. Multiple-part cyclic hoist scheduling using a sieve method , 1999, IEEE Trans. Robotics Autom..
[20] Vadim E. Levit,et al. An improved algorithm for cyclic flowshop scheduling in a robotic cell , 1997 .
[21] Qiang Xu,et al. Real‐time dynamic hoist scheduling for multistage material handling process under uncertainties , 2013 .
[22] Chengbin Chu,et al. Optimal cyclic scheduling of a robotic flowshop with multiple part types and flexible processing times , 2014 .
[23] Chuanyu Zhao,et al. Debottleneck of Multistage Material-Handling Processes via Simultaneous Hoist Scheduling and Production Line Retrofit , 2012 .
[24] Pengyu Yan,et al. Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance , 2014, Comput. Oper. Res..
[25] Marie-Ange Manier,et al. A Classification for Hoist Scheduling Problems , 2003 .
[26] Marie-Ange Manier,et al. A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem , 2013, Comput. Ind. Eng..
[27] Yuehwern Yih,et al. An algorithm for hoist scheduling problems , 1994 .
[28] Mark Wallace,et al. A Generic Model and Hybrid Algorithm for Hoist Scheduling Problems , 1998, CP.
[29] Chengbin Chu,et al. Cyclic hoist scheduling in large real-life electroplating lines , 2007, OR Spectr..
[30] Ada Che,et al. Real‐time hoist scheduling for multistage material handling process under uncertainties , 2013 .
[31] Pierre Baptiste,et al. Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions , 1997 .
[32] Christian Bierwirth,et al. A heuristic scheduling procedure for multi-item hoist production lines , 2007 .
[33] Kin Keung Lai,et al. A study of heuristics for bidirectional multi-hoist production scheduling systems , 1994 .
[34] Richard Y. K. Fung,et al. A mixed integer linear programming solution for single hoist multi-degree cyclic scheduling with reentrance , 2014 .
[35] Ling Li,et al. A solution for cyclic scheduling of multi-hoists without overlapping , 2009, Ann. Oper. Res..
[36] Eugene Levner,et al. A Parametric Critical Path Problem and an Application for Cyclic Scheduling , 1998, Discret. Appl. Math..
[37] Neil Yorke-Smith,et al. An Improved Hybrid Model for the Generic Hoist Scheduling Problem , 2002, Ann. Oper. Res..
[38] Raymond W. T. Mak,et al. MODELING OF MATERIAL HANDLING HOIST OPERATIONS IN A PCB MANUFACTURING FACILITY , 2002 .
[39] Jacques Lamothe,et al. A dynamic heuristic for the real time hoist scheduling problem , 1995, Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation. ETFA'95.
[40] Chengbin Chu,et al. An Improved Mixed Integer Programming Approach for Multi-Hoist Cyclic Scheduling Problem , 2014, IEEE Transactions on Automation Science and Engineering.
[41] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[42] Yun Jiang,et al. A new model and an efficient branch-and-bound solution for cyclic multi-hoist scheduling , 2014 .
[43] Yun Jiang,et al. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution , 2002 .
[44] Zhen Zhou,et al. A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints , 2012 .
[45] L. Lei,et al. DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINE , 1994 .