Product due date assignment for complex assemblies
暂无分享,去创建一个
[1] Gary L. Ragatz,et al. A framework for the study of due date management in job shops , 1984 .
[2] Zvi Drezner,et al. A Multivariate Approach to Estimating the Completion Time for PERT Networks , 1986 .
[3] Stephen R. Lawrence,et al. Estimating flowtimes and setting due-dates in complex production systems , 1995 .
[4] James K. Weeks. A Simulation Study of Predictable Due-Dates , 1979 .
[5] Wallace J. Hopp,et al. Quoting manufacturing due dates subject to a service level constraint , 2000 .
[6] John E. Tyworth,et al. Robustness of the normal approximation of lead‐time demand in a distribution setting , 1997 .
[7] H. M. Soroush,et al. Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs , 1999, Eur. J. Oper. Res..
[8] Christopher Earl,et al. Modelling supply chain management processes in engineer-to-order companies , 1999 .
[9] Salah E. Elmaghraby,et al. Optimal start times under stochastic activity durations , 2000 .
[10] B. Kingsman,et al. Production planning systems and their applicability to make-to-order companies , 1989 .
[11] Robert Oven,et al. Representation of ion implantation profiles by Pearson frequency distribution curves , 1990 .
[12] H. M. Soroush. The Most Critical Path in a PERT Network , 1994 .
[13] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[14] Pierpaolo Pontrandolfo,et al. Project duration in stochastic networks by the PERT-path technique , 2000 .
[15] James H. Bookbinder,et al. Setting Job-Shop Due-Dates with Service-Level Constraints , 1985 .
[16] Elliot D. Minor,et al. Regression-based due date assignment rules for improved assembly shop performance , 1995 .
[17] Abraham Seidmann,et al. Due Date Assignment for Production Systems , 1981 .
[18] Nicholas R. Farnum,et al. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .
[19] E. Parzen,et al. Modern Probability Theory and Its Applications , 1960 .
[20] Vincent A. Mabert,et al. Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .
[21] L. P. Rees,et al. Cost‐based due‐date assignment with the use of classical and neural‐network approaches , 1997 .
[22] Candace Aral Yano,et al. Stochastic Leadtimes in Two-Level Assembly Systems , 1987 .
[23] Timothy D. Fry,et al. The effects of product structure and sequencing rule on assembly shop performance , 1989 .
[24] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[25] J. Shanthikumar,et al. Approximations for the time spent in a dynamic job shop with applications to due-date assignment , 1988 .
[26] Brian G. Kingsman,et al. Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make-to-Order Companies , 1993 .
[27] William L. Berry,et al. Manufacturing Planning and Control Systems , 1984 .
[28] Nabil R. Adam,et al. Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops , 1993 .
[29] B. Atkinson. Queuing Theory in Manufacturing Systems Analysis and Design , 1995 .
[30] N. Cox. Statistical Models in Engineering , 1970 .
[31] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .
[32] F. B. Cowell,et al. The Completion Time of PERT Networks , 1983 .
[33] William L. Maxwell,et al. Theory of scheduling , 1967 .
[34] Pm Braiden,et al. Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach , 2000 .
[35] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .