Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices
暂无分享,去创建一个
[1] Peter Guthrie,et al. WASTE MINIMISATION AND RECYCLING IN CONSTRUCTION - A REVIEW , 1995 .
[2] Priory Road,et al. Waste minimisation and recycling , 2011 .
[3] Geoff Rounce. Quality, waste and cost considerations in architectural building design management , 1998 .
[4] George Ofori,et al. Building waste assessment score: design-based tool , 2004 .
[5] Eduardo Peris Mora,et al. Life cycle, sustainability and the transcendent quality of building materials , 2007 .
[6] Andrew D.F. Price,et al. Architect and contractor attitudes to waste minimisation , 2006 .
[7] Chi Sun Poon,et al. Management of construction waste in public housing projects in Hong Kong , 2004 .
[8] George Ofori,et al. CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .
[9] Andrew N. Baldwin,et al. Designing to encourage waste minimisation in the construction industry , 2000 .
[10] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[11] H. K. Jacobsen. Case studies on waste minimisation practices in Europe , 2002 .
[12] John Saunders,et al. Attitudes towards waste minimisation amongst labour only sub‐contractors , 2004 .
[13] George Ofori,et al. ISO 14000: Its relevance to the construction industry of Singapore and its potential as the next industry milestone , 1999 .
[14] Yasuyoshi Miyatake,et al. Technology Development and Sustainable Construction , 1996 .
[15] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[16] Andrew R.J. Dainty,et al. Towards improved construction waste minimisation: a need for improved supply chain integration? , 2004 .
[17] Rawshan Ara Begum,et al. A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .
[18] P. Graham,et al. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation , 2000 .
[19] Vivian W. Y Tam,et al. Implementation of environmental management in the Hong Kong construction industry , 2002 .
[20] S. Naoum. Dissertation Research and Writing for Construction Students , 1997 .
[21] David Seymour,et al. The culture of the industry and the culture of research , 1995 .
[22] Luis F Alarcón. Modeling waste and performance in construction , 1997 .
[23] G. Ofori. Greening the construction supply chain in Singapore , 2000 .
[24] F. Shafii,et al. ACHIEVING SUSTAINABLE CONSTRUCTION IN THE DEVELOPING COUNTRIES OF SOUTHEAST ASIA , 2006 .
[25] Guinevere Gilbert,et al. Improving solid waste reduction and recycling performance using goal setting and feedback , 2001 .
[26] Fabian C. Hadipriono,et al. Construction safety performance in the United Arab Emirates , 2003 .
[27] Carlos T. Formoso,et al. Method for Waste Control in the Building Industry , 1999 .
[28] S. El-Sayegh. Risk assessment and allocation in the UAE construction industry , 2008 .
[29] Mark Smithers,et al. Implementing a waste management plan during the construction phase of a project: a case study , 1998 .
[30] Martin Loosemore,et al. OPERATIVES ' ATTITUDES TOWARDS WASTE ON CONSTRUCTION PROJECT , 2005 .
[31] Weisheng Lu,et al. A computer-based scoring method for measuring the environmental performance of construction activities , 2005 .
[32] Saif Al-Qaydi. Industrial solid waste disposal in Dubai, UAE: A study in economic geography , 2006 .
[33] A Craighill,et al. Information: The key to sustainability in the building sector , 2001 .
[34] Peter E.D. Love,et al. AN ANALYSIS OF FACTORS INFLUENCING WASTE MINIMISATION AND USE OF RECYCLED MATERIALS FOR THE CONSTRUCTION OF RESIDENTIAL BUILDINGS , 2003 .
[35] Chi Ming Tam,et al. Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations , 2007 .