Database Framework for Cost, Schedule, and Performance Data Integration
暂无分享,去创建一个
[1] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[2] Boyd C. Paulson,et al. Adaptability of information classification systems for civil works , 1997 .
[3] Neil N. Eldin. Measurement of Work Progress: Quantitative Technique , 1989 .
[4] Sungkwon Woo,et al. Flexible Work Breakdown Structure for Integrated Cost and Schedule Control , 2004 .
[5] G. Edward Gibson,et al. PLANNING FOR COMPUTER INTEGRATED CONSTRUCTION , 1999 .
[6] Osama Abudayyeh,et al. Cost‐ and Schedule‐Control Integration: Issues and Needs , 1991 .
[7] Robert I. Carr. COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION , 1993 .
[8] Paul M. Teicholz. Current Needs for Cost Control Systems , 1987 .
[9] A.A.D.A.J. Perera,et al. An integrated construction project cost information system using MS Access™ and MS Project™ , 2004 .
[10] Boyd C. Paulson,et al. Information management to integrate cost and schedule for civil engineering projects , 1998 .
[11] Means,et al. Building construction cost data , 1943 .
[12] Quentin W. Fleming,et al. Earned Value Project Management , 1996 .
[13] Boyd C. Paulson,et al. Professional construction management : including C.M., design-construct, and general contracting , 1992 .