GIS-based visualization of integrated highway maintenance and construction planning: a case study of Fort Worth, Texas

BackgroundThis paper reports on a case study of the use of visualization of geospatial data that is distributed across data sets and requires integration over time and space to aid decision makers. Like many State Highway Agencies (SHAs) in the United States, the Texas Department of Transportation (TxDOT) is organized along the traditional functional lines of planning, design, construction, maintenance, and operations. It has historically relied on experience and longevity of its staff to efficiently and effectively plan its construction and maintenance projects. Although functional boundaries of maintenance and construction are fairly clearly defined, there tends to be some overlap in projects that can be executed by either of the functional groups. The department currently does not have a robust integrated information system for identifying potential planning conflicts between its construction and maintenance projects. This has led to suboptimal use of resources, including overlapping plans for maintenance and mobility enhancement projects.Case descriptionWith over 650 highway projects assigned across two functional groups within the district’s (TxDOT Fort Worth district) boundary, it is a challenging task to assemble a coherent plan for managing these projects over a multi-year planning period that is subject to external stakeholder input as well as shifting funding constraints. Temporal and spatial data needed for integrated planning resides in specialized information systems developed for the needs of individual functional groups. To address this challenge, this district decided to integrate and visualize data from individual information systems in a Geographic Information System (GIS). A GIS-based tool was developed to integrate, visualize, and analyze projects data from multiple information systems.Discussion and evaluationThis paper documents the benefits associated with visualization and integration of projects data in a GIS to address planning challenges facing a typical highway agency. Among the lessons learned are the potential uses of GIS, which include detecting spatially and temporally overlapping projects, supporting integrated planning, and improving communication among functional groups within a state highway agency.ConclusionThe study demonstrates that such spatial-temporal representations of project data can lead to early identification of potential overlaps during the planning phase. In a broader context, such geospatial visualization efforts can also form the basis for eliciting practitioners’ perspectives and knowledge input in the development of spatial decision support systems.

[1]  Lance A Neumann,et al.  METHODS FOR CAPITAL PROGRAMMING AND PROJECT SELECTION , 1997 .

[2]  Manoranjan Parida,et al.  Enhancing pavement management systems using GIS , 2005 .

[3]  Charles G. OHara,et al.  Evaluating the Design of the Streamlined GIS-Based Transportation Corridors , 2011 .

[4]  Timothy C Rydholm,et al.  Visualizing Pavement Management Data at the Project Level , 2015 .

[5]  Seokho Chi,et al.  Development of network-level project screening methods supporting the 4-Year pavement management plan in Texas , 2013 .

[6]  S. Travis Waller,et al.  An Internet-based geographic information system that integrates data, models and users for transportation applications , 2000 .

[7]  Suzana Dragicevic,et al.  A Web GIS collaborative framework to structure and manage distributed planning processes , 2004, J. Geogr. Syst..

[8]  K. Kockelman,et al.  Public perceptions of toll roads : A survey of the Texas perspective , 2006 .

[9]  Sylwia Męcfal Recenzja książki. Robert K. yin, Case Study Research. Design and Methods (fourth Edition), thousand Oaks, CA: Sage Publications, 2009 , 2012 .

[10]  Jean-Claude Thill,et al.  Geographic information systems for transportation in perspective , 2000 .

[11]  Hosin Lee,et al.  Development of Geographic Information System-Based Pavement Management System for Salt Lake City , 1996 .

[12]  Robert E. Chapman,et al.  Impact of Information Technologies on Performance: Cross Study Comparison , 2008 .

[13]  Paul Schonfeld,et al.  Using GIS, Genetic Algorithms, and Visualization in Highway Development , 2001 .

[14]  John P Zaniewski,et al.  Geographic Information Systems-Based Pavement Management System: A Case Study , 1999 .

[15]  G W Flintsch,et al.  PAVEMENT MANAGEMENT APPLICATIONS USING GEOGRAPHIC INFORMATION SYSTEMS , 2004 .

[16]  Michelle Oswald Beiler,et al.  Integrating GIS and AHP to Prioritize Transportation Infrastructure Using Sustainability Metrics , 2015 .

[17]  Erhard Rahm,et al.  Data Cleaning: Problems and Current Approaches , 2000, IEEE Data Eng. Bull..

[18]  Jim Cox,et al.  Benefits of Geographic Information Systems in Managing a Major Transportation Program , 2012 .

[19]  Yichang James Tsai,et al.  Framework and Strategy for Implementing an Information Technology-Based Pavement Management System , 2002 .

[20]  Zhanmin Zhang,et al.  Geographic Information System Implementation Plan for Pavement Management Information System: Texas Department of Transportation , 2001 .

[21]  Kara M. Kockelman,et al.  Development of Best Practices for Right-of-Way Valuations and Negotiations in Transportation Projects , 2011 .

[22]  Chen Chen,et al.  Asset Management Data Collection For Supporting Decision Processes , 2005 .

[23]  H. David Jeong,et al.  Framework for Integrating and Assessing Highway Infrastructure Data , 2016 .

[24]  Cameron W Schmeits,et al.  Benefits of Three- and Four-Dimensional Computer-Aided Design Model Applications for Review of Constructability , 2012 .

[25]  Guoqing Zhou,et al.  Integration of GIS and Data Mining Technology to Enhance the Pavement Management Decision Making , 2010 .

[26]  Aemal J. Khattak,et al.  Highway Safety Assessment through Geographic Information System-Based Data Visualization , 2005 .

[27]  Nabeel Khwaja,et al.  Civil Integrated Management for Highway Infrastructure: Case Studies and Lessons Learned , 2016 .

[29]  Mike Murphy,et al.  A Four-Year Pavement Management Plan (FY 2011-FY 2014) , 2012 .

[30]  Mark Sarmiento,et al.  Best practices in geographic information systems-based transportation asset management , 2012 .

[31]  Jose Weissmann,et al.  GIS integrated pavement and infrastructure management in urban areas , 1994 .

[32]  Hassan A. Karimi,et al.  Transportation Distance Measurement Data Quality , 2003 .

[33]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[34]  P. Waddell Integrated Land Use and Transportation Planning and Modelling: Addressing Challenges in Research and Practice , 2011 .