The use of light-gauge steel framing in low-rise commercial and industrial building construction has experienced a significant increase in recent years. In such construction, the wall framing is an assembly of cold-formed steel (CFS) studs held between top and bottom CFS tracks. Current construction methods utilize heavy hot-rolled steel sections, such as steel angles or hollow structural section tubes, to transfer the load from the end seats of the floor joist and/or from the load-bearing wall studs of the stories above to the supporting load-bearing wall below. The use of hot rolled steel elements results in significant increase in construction cost and time. Such heavy steel elements would be unnecessary if the concrete slab thickening on top of the CFS wall can be made to act compositely with the CFS track. Composite action can be achieved by attaching stand-off screws to the track and encapsulating the screw shank in the deck concrete. A series of experimental studies were performed on full-scale test specimens representing concrete/CFS flexural elements under gravity loads. The studies were designed to investigate the structural performance of concrete/CFS simple beams and concrete/CFS continuous headers. The results indicate that concrete/CFS composite flexural elements are feasible and their structural behavior can be modeled with reasonable accuracy.
[1]
Emad L. Labib,et al.
Shear Cracking of Prestressed Girders with High Strength Concrete
,
2013,
International Journal of Concrete Structures and Materials.
[2]
Pouria Bahmani.
Structural performance of concrete/cold-formed steel composite beams supporting composite floor decks
,
2010
.
[3]
William E. Piper,et al.
Editor's Note 3
,
1999
.
[4]
Jack P. Moehle,et al.
"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-11) AND COMMENTARY"
,
2011
.
[5]
Adel ElSafty,et al.
Investigation of Likelihood of Cracking in Reinforced Concrete Bridge Decks
,
2013
.