Data in risk assessment of mega-city infrastructures related to land subsidence using improved trapezoidal FAHP
暂无分享,去创建一个
Jun Yang | Annan Zhou | Hai-Min Lyu | Shui-Long Shen | H. Lyu | S. Shen | Annan Zhou | Jun Yang
[1] Mingju Zhang,et al. Improved AHP Method and Its Application in Risk Identification , 2013 .
[2] Shui-Long Shen,et al. Risk Assessment Using a New Consulting Process in Fuzzy AHP , 2020 .
[3] Jun Yang,et al. Risk assessment of mega-city infrastructures related to land subsidence using improved trapezoidal FAHP. , 2019, The Science of the total environment.
[4] Sangwook Lee,et al. Determination of Priority Weights under Multiattribute Decision-Making Situations: AHP versus Fuzzy AHP , 2015 .
[5] T. L. Saaty. A Scaling Method for Priorities in Hierarchical Structures , 1977 .
[6] H. Lyu,et al. Flood risk assessment in metro systems of mega-cities using a GIS-based modeling approach. , 2018, The Science of the total environment.
[7] Annan Zhou,et al. Perspectives for flood risk assessment and management for mega-city metro system , 2019, Tunnelling and Underground Space Technology.
[8] H. Lyu,et al. Data in flood risk assessment of metro systems in a subsiding environment using the interval FAHP–FCA approach , 2019, Data in brief.
[9] H. Lyu,et al. Inundation analysis of metro systems with the storm water management model incorporated into a geographical information system: a case study in Shanghai , 2019, Hydrology and Earth System Sciences.
[10] Mohammad Ataei,et al. Ranking of geological risks in mechanized tunneling by using Fuzzy Analytical Hierarchy Process (FAHP) , 2015 .