시뮬레이션을 이용한 작업자/복수기계 가동분석에 대한 사례연구

This paper deals with a case study of workload analysis of an operator in an automatic line for machining the race of ball bearing. Eleven machines and three hoppers are installed in the line which is operated by an operator. The elements of operation are separated into machine controlled elements, operator controlled elements and machine/operator controlled elements. In order to analyze the system, time and motion studies are used for gathering input data for the simulation model. The first objective of this study is to evaluate whether the workload of operator is reasonable or not. The second objective is to increase throughput by reducing tact time and the last one is to increase frequencies of inspection by reducing interval. Thus we suggest some ideas for improvement, and as a result, the throughput is improved about 9%. In spite of the increasing of throughput, the allowance of operator is also increased about 4%.