Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path

AbstractUnnecessary material transportation accounts for a significant portion of nonproductive work. Previous research has paid much attention to site-level transportation but little attention to floor-level transportation. This is because the distance of floor-level material transportation is relatively small compared to that at the site-level. With an increase in the size, height, and complexity of building projects, the impact of floor-level transportation on worker productivity and project performance has significantly increased. This paper introduces a floor-level construction material layout planning model which can represent (1) Various shapes of an installation task and (2) actual travel distance, both of which are necessary for a realistic representation of floor-level material transportation. Applied to a high-rise residential apartment project, the model has proven to be effective in minimizing travel distance and travel time. On the basis of this finding, this paper concludes that the model h...

[1]  Khaled A El-Rayes,et al.  Dynamic Site Layout Planning Using Approximate Dynamic Programming , 2009 .

[2]  Tarek Hegazy,et al.  EvoSite: Evolution-Based Model for Site Layout Planning , 1999 .

[3]  Iris D. Tommelein,et al.  Space Scheduling Using Flow Analysis , 1999 .

[4]  Tarek Hegazy,et al.  DYNAMIC LAYOUT OF CONSTRUCTION TEMPORARY FACILITIES CONSIDERING SAFETY , 2004 .

[5]  Sang-Youb Lee,et al.  Optimization of floor-level construction material layout using Genetic Algorithms , 2007 .

[6]  Feniosky Peña-Mora,et al.  Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects , 2012 .

[7]  Min-Yuan Cheng,et al.  ArcSite: enhanced GIS for construction site layout , 1996 .

[8]  Iris D. Tommelein,et al.  Dynamic layout planning using a hybrid incremental solution method , 1999 .

[9]  Peter E.D. Love,et al.  Genetic search for solving construction site-level unequal-area facility layout problems , 2000 .

[10]  Hyoun Seung Jang Construction Materials Allocation with Genetic Algorithm , 2003 .

[11]  Eddy M. Rojas Construction Productivity: A Practical Guide for Building and Electrical Contractors , 2008 .

[12]  Sy-Jye Guo,et al.  Identification and Resolution of Work Space Conflicts in Building Construction , 2002 .

[13]  Laurence R. Rilett,et al.  Incorporating Uncertainty and Multiple Objectives in Real-Time Route Selection , 2001 .

[14]  Alfredo Serpell,et al.  Characterization of waste in building construction projects , 1997 .

[15]  Iris D. Tommelein,et al.  IMPROVEMENT ALGORITHM FOR LIMITED SPACE SCHEDULING , 2001 .

[16]  Iris D. Tommelein,et al.  SightPlan Model for Site Layout , 1992 .

[17]  Mohammad A. Ammar,et al.  Optimal Construction Site Layout Considering Safety and Environmental Aspects , 2008 .