Joint optimization of redundancy level and spare part inventories
暂无分享,去创建一个
[1] Matthieu van der Heijden,et al. Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity , 2007 .
[2] H. Tijms. A First Course in Stochastic Models , 2003 .
[3] Craig C. Sherbrooke,et al. Optimal Inventory Modeling of Systems , 1992 .
[4] Min Xie,et al. A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting , 2015 .
[5] Wenbin Wang,et al. A stochastic model for joint spare parts inventory and planned maintenance optimisation , 2012, Eur. J. Oper. Res..
[6] Wei Xie,et al. Maximizing system availability through joint decision on component redundancy and spares inventory , 2014, Eur. J. Oper. Res..
[7] Baris Selçuk,et al. Joint spare parts inventory and reliability decisions under a service constraint , 2013, J. Oper. Res. Soc..
[8] Craig C. Sherbrooke,et al. Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .
[9] Matthieu van der Heijden,et al. On the interaction between maintenance, spare part inventories and repair capacity for a k , 2006, Eur. J. Oper. Res..
[10] Andrei Sleptchenko,et al. Integral inventory control in spare parts networks with capacity restrictions , 2002 .
[11] David R. Godoy,et al. Critical spare parts ordering decisions using conditional reliability and stochastic lead time , 2013, Reliab. Eng. Syst. Saf..
[12] F. Kelly. Blocking probabilities in large circuit-switched networks , 1986, Advances in Applied Probability.
[13] Tore Markeset,et al. Application of reliability models with covariates in spare part prediction and optimization - A case study , 2014, Reliab. Eng. Syst. Saf..
[14] Rommert Dekker,et al. Spare parts stock control for redundant systems using reliability centered maintenance data , 2011, Reliab. Eng. Syst. Saf..
[15] Dragan Banjevic,et al. Joint optimal inspection and inventory for a k-out-of-n system , 2014, Reliab. Eng. Syst. Saf..
[16] Dragan Banjevic,et al. Spare parts provisioning for multiple k-out-of-n:G systems , 2013 .
[17] Peter Knights,et al. A decision-making framework to integrate maintenance contract conditions with critical spares management , 2014, Reliab. Eng. Syst. Saf..
[18] Alan G. Hawkes,et al. AVAILABILITY OF AN R -OUT-OF-N SYSTEM WITH SPARES AND REPAIRS , 1991 .
[19] Ana Isabel Barros,et al. A spare parts model with cold-standby redundancy on system level , 2011, Comput. Oper. Res..
[20] Antonio Gómez-Corral,et al. The influence of delivery times on repairable k-out-of-N systems with spares , 2009 .
[21] Liliane Pintelon,et al. The Effect of Maintenance Quality on Spare Parts Inventory for a Fleet of Assets , 2013, IEEE Transactions on Reliability.
[22] Francesco Costantino,et al. Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints , 2013, Reliab. Eng. Syst. Saf..
[23] Fan Zhang,et al. Optimal maintenance models with minimal repair, periodic overhaul and complete renewal , 1998 .
[24] van Geert-Jan Geert-Jan Houtum,et al. System-oriented inventory models for spare parts , 2014 .
[25] Elsayed A. Elsayed,et al. Reliability Engineering , 1996 .
[26] Tongdan Jin,et al. System availability under redundancy sharing of standby components , 2015, 2015 Annual Reliability and Maintainability Symposium (RAMS).
[27] Dirk Cattrysse,et al. Joint maintenance and inventory optimization systems: A review , 2013 .
[28] Qingwei Chen,et al. Multi-objective reliability redundancy allocation in an interval environment using particle swarm optimization , 2016, Reliab. Eng. Syst. Saf..
[29] Jeffery K. Cochran,et al. Computing small-fleet aircraft availabilities including redundancy and spares , 2002, Comput. Oper. Res..
[30] Patrik Alfredsson,et al. Modeling emergency supply flexibility in a two-echelon inventory system , 1999 .
[31] Wenbin Wang,et al. A prognostics-based spare part ordering and system replacement policy for a deteriorating system subjected to a random lead time , 2015 .
[32] Matthieu van der Heijden,et al. On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy , 2004, Reliab. Eng. Syst. Saf..