Design Study of a Humidification Tower for the Advanced Humid Air Turbine System
暂无分享,去创建一个
[1] J. H. Horlock,et al. A New Method to Calculate the Coolant Requirements of a High-Temperature Gas Turbine Blade , 2005 .
[2] Nariyoshi Kobayashi,et al. Experimental Study on Diffusion Flame Combustor for Advanced Humid Air Turbine , 2002 .
[3] Hidefumi Araki,et al. An Evaluation of Advanced Humid Air Turbine System With Water Recovery , 2004 .
[4] Michael Bartlett. Developing Humidified Gas Turbine Cycles , 2002 .
[5] Hidefumi Araki,et al. A Study of Performance on Advanced Humid Air Turbine Systems , 2006 .
[6] Alberto Traverso,et al. Micro Humid Air Cycle: Part A — Thermodynamic and Technical Aspects , 2003 .
[7] Marcus Thern,et al. Experimental and Theoretical Results of a Humidification Tower in an Evaporative Gas Turbine Cycle Pilot Plant , 2002 .
[8] A. Aramayo-Prudencio,et al. The Analysis and Design of Saturators for Power Generation Cycles: Part 2 — Heat and Mass Transfer , 2003 .
[9] Alberto Traverso,et al. Saturator analysis for an evaporative gas turbine cycle , 2003 .