A fault-tolerant and energy efficient control strategy for primary–secondary chilled water systems in buildings
暂无分享,去创建一个
[1] W. Kirsner. The demise of the primary-secondary pumping paradigm for chilled water plant design , 1996 .
[2] T. H. Durkin. Evolving Design of Chiller Plants , 2005 .
[3] Steven T. Taylor. Primary-only vs. primary-secondary variable flow systems , 2002 .
[4] R. S. Powell,et al. Optimal Pump Scheduling in Water Supply Systems with Maximum Demand Charges , 2003 .
[5] D. P. Fiorino. Achieving high chilled-water Delta Ts , 1999 .
[6] Gil Avery. Improving the Efficiency of Chilled Water Plants , 2001 .
[7] Lindell Ormsbee,et al. Computer-generated pumping schedules for satisfying operational objectives , 1993 .
[8] Shengwei Wang,et al. Secondary loop chilled water in super high-rise , 2008 .
[9] D. W. Jack,et al. Pump scheduling and cost optimization , 1991 .
[10] W. J. Coad. A fundamental perspective on chilled water systems , 1998 .
[11] James P. Waltz. Variable flow chilled water or how I learned to love my VFD , 2000 .
[12] G. Avery. Controlling chillers in variable flow systems , 1998 .
[13] Yongjun Sun,et al. Model-based optimal start control strategy for multi-chiller plants in commercial buildings , 2010 .
[14] Shengwei Wang,et al. Intelligent Buildings and Building Automation , 2009 .
[15] G. Yu,et al. Optimized pump scheduling in water distribution systems , 1994 .
[16] Zhenjun Ma,et al. Energy efficient control of variable speed pumps in complex building central air-conditioning systems , 2009 .