Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems

To achieve a high system availability at minimal costs, relevant decisions include the choice of preventive maintenance frequency, spare part inventory levels and spare part repair capacity. We develop heuristics for the joint optimisation of these variables for (a) a single k-out-of-N system under condition-based maintenance and (b) an installed base of multiple identical k-out-of-N systems under block replacement. We show that a straightforward extension of the METRIC method for spare part inventory optimisation yields inferior results, because both the availability and costs are not necessarily monotonous functions of the decision variables. We develop an adjusted marginal analysis and show that it performs considerably better in numerical experiments.

[1]  Matthieu van der Heijden,et al.  On the interaction between maintenance, spare part inventories and repair capacity for a k , 2006, Eur. J. Oper. Res..

[2]  Andrei Sleptchenko,et al.  Integral inventory control in spare parts networks with capacity restrictions , 2002 .

[3]  John A. Muckstadt,et al.  Analysis and Algorithms for Service Parts Supply Chains , 2008 .

[4]  Matthieu van der Heijden,et al.  On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy , 2004, Reliab. Eng. Syst. Saf..

[5]  Kyung S. Park,et al.  Generalized spare ordering policies with random lead time , 1986 .

[6]  Willem H.M. Zijm,et al.  Capacitated two-echelon inventory models for repairable item systems , 2003 .

[7]  A. van Harten,et al.  Using repair priorities to reduce stock investment in spare part networks , 2005, Eur. J. Oper. Res..

[8]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[9]  Alenka Hudoklin,et al.  Joint optimization of block-replacement and periodic-review spare-provisioning policy , 2003, IEEE Trans. Reliab..

[10]  Matthieu van der Heijden,et al.  Trade-off between inventory and repair capacity in spare part networks , 2003, J. Oper. Res. Soc..

[11]  John Crocker,et al.  Reliability, Maintenance and Logistic Support: - A Life Cycle Approach , 2000 .

[12]  R. Natarajan A Reliability Problem with Spares and Multiple Repair Facilities , 1968, Oper. Res..

[13]  Kuo-Hsiung Wang,et al.  Cost analysis of the M/M/R machine-repair problem with mixed standby spares , 1993 .

[14]  Richard M. Soland,et al.  On Some Common Interests Among Reliability, Inventory, and Queuing , 1985, IEEE Transactions on Reliability.

[15]  A.B.M. Zohrul Kabir,et al.  A stocking policy for spare part provisioning under age based preventive replacement , 1996 .

[16]  Geert-Jan van Houtum,et al.  Capacitated two-indenture models for repairable item systems , 2001 .

[17]  W. D. Rustenburg A system approach to budget-constrained spare parts management , 2000 .

[18]  Andrei Sleptchenko,et al.  Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems , 2002 .

[19]  Kuo-Hsiung Wang,et al.  An approach to cost analysis of the machine repair problem with two types of spares and service rates , 1995 .

[20]  S.-K. Park,et al.  An optimal algorithm for repairable-item inventory system with depot spares , 2000, J. Oper. Res. Soc..

[21]  K. S. de Smidt-Destombes,et al.  Spares and repairs for maintaining redundant systems , 2006 .

[22]  S. H. A. Farrash,et al.  Simulation of an integrated age replacement and spare provisioning policy using SLAM , 1996 .

[23]  Matthieu van der Heijden,et al.  Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity , 2007 .

[24]  Anis Chelbi,et al.  Spare provisioning strategy for preventively replaced systems subjected to random failure , 2001 .