A flexible architecture for call centers with skill-based routing
暂无分享,去创建一个
[1] Vito Albino,et al. Limited flexibility in cellular manufacturing systems: A simulation study , 1999 .
[2] Stephen C. Graves,et al. Process Flexibility in Supply Chains , 2003, Manag. Sci..
[3] Wallace J. Hopp,et al. Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..
[4] Sem C. Borst,et al. Dimensioning Large Call Centers , 2000, Oper. Res..
[5] Zeynep Akşin,et al. The Modern Call Center: A Multi‐Disciplinary Perspective on Operations Management Research , 2007 .
[6] Saifallah Benjaafar,et al. Machine Sharing in Manufacturing Systems: Total Flexibility versus Chaining , 1998 .
[7] Ramandeep S. Randhawa,et al. Optimal Flexibility Configurations in Newsvendor Networks: Going Beyond Chaining and Pairing , 2010, Manag. Sci..
[8] Saifallah Benjaafar,et al. Performance bounds for the effectiveness of pooling in multi-processing systems , 1995 .
[9] Avishai Mandelbaum,et al. On Pooling in Queueing Networks , 1998 .
[10] Saif Benjaafar,et al. Modeling and analysis of flexible queueing systems , 2004 .
[11] Avishai Mandelbaum,et al. Adaptive Behavior of Impatient Customers in Tele-Queues: Theory and Empirical Support , 2002, Manag. Sci..
[12] Avishai Mandelbaum,et al. An Introduction to Skills-Based Routing and its Operational Complexities , 2003 .
[13] A. Claudio Garavelli,et al. Flexibility configurations for the supply chain management , 2003 .
[14] A. Claudio Garavelli. Performance analysis of a batch production system with limited flexibility , 2001 .
[15] Giancarlo Succi,et al. To pull or not to pull , 2009, OOPSLA Companion.
[16] W. Whitt,et al. Resource sharing for efficiency in traffic systems , 1981, The Bell System Technical Journal.
[17] Robert A. Shumsky,et al. Routing and Staffing in Large Call Centers with Specialized and Fully Flexible Servers , 2004 .
[18] Yimin Wang,et al. On the Value of Mix Flexibility and Dual Sourcing in Unreliable Newsvendor Networks , 2005, Manuf. Serv. Oper. Manag..
[19] Cheryl Gaimon,et al. The Management of Technology: A Production and Operations Management Perspective , 2008 .
[20] William C. Jordan,et al. Principles on the benefits of manufacturing process flexibility , 1995 .
[21] Seyed M. R. Iravani,et al. Call-Center Labor Cross-Training: It's a Small World After All , 2007, Manag. Sci..
[22] Terry P. Harrison,et al. Partial cross training in call centers with uncertain arrivals and global service level agreements , 2007, 2007 Winter Simulation Conference.
[23] Ward Whitt,et al. A Staffing Algorithm for Call Centers with Skill-Based Routing , 2005, Manuf. Serv. Oper. Manag..
[24] Wallace J. Hopp,et al. Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract , 2002, Manuf. Serv. Oper. Manag..
[25] Durk-Jouke van der Zee,et al. Virtual cellular manufacturing: Configuring routing flexibility , 2008 .
[26] Fikri Karaesmen,et al. Characterizing the performance of process flexibility structures , 2007, Oper. Res. Lett..
[27] Ger Koole,et al. First in Line Waiting Times as a Tool for Analysing Queueing Systems , 2012, Oper. Res..
[28] William C. Jordan,et al. Chained cross-training of workers for robust performance , 2004 .
[29] Pierre L'Ecuyer,et al. Staffing multi-skill call centers via search methods and a performance approximation , 2009 .
[30] Avishai Mandelbaum,et al. Statistical Analysis of a Telephone Call Center , 2005 .
[31] Wallace J. Hopp,et al. Agile workforce evaluation: a framework for cross-training and coordination , 2004 .
[32] N. M. vanDijk,et al. To Pool or Not to Pool in Call Centers , 2008 .
[33] Wallace J. Hopp,et al. Pooling strategies for call center agent cross-training , 2009 .