Cut-slope versus shallow tunnel: Risk-based decision making framework for alternative selection

Choice between cut-slope and shallow tunnel alternatives is a common decision-making problem in the construction of highways or railways in mountainous regions. This paper outlines a risk-based decision making framework. Five indicators, including construction cost, duration, casualties, time overruns and economic loss, are adopted to evaluate the two alternatives, cut-slope and shallow tunnel. Landslide and tunnel collapse risks are analyzed quantitatively for these two alternatives. Based on reliability analysis, the probabilities of landslide and tunnel collapse are estimated. The extent of likely impacted area is delimited based on the failure potential. Then, according to the exposed elements within the impacted area, the consequences are estimated using Monte-Carlo simulation and event tree approach. A computer code was developed for quantitative risk assessment and multi-objective optimization, and an example is presented to illustrate the entire process.

[1]  Ma Guoyan,et al.  Underground excavation in Xiaolangdi project in Yellow River , 2004 .

[2]  Brenda McCabe,et al.  Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model , 2003 .

[3]  Herbert H. Einstein,et al.  Decision analysis applied to rock tunnel exploration , 1976 .

[4]  Edward R. Fisk Construction Project Administration , 1978 .

[5]  C. H. Juang,et al.  Stability analysis of existing slopes considering uncertainty , 1998 .

[6]  Hong-wei Huang,et al.  Quantitative Risk Assessment of Cut-Slope Projects under Construction , 2010 .

[7]  Ming-Der Yang,et al.  Risk assessment of debris flows in Songhe Stream, Taiwan , 2011 .

[8]  K. Phoon,et al.  Characterization of Geotechnical Variability , 1999 .

[9]  Michael Jefferies,et al.  Risk assessment: where are we, and where are we going? , 1996, Geological Society, London, Engineering Geology Special Publications.

[10]  Fuchu Dai,et al.  Landslide risk assessment and management: an overview , 2002 .

[11]  Herbert H. Einstein Risk and risk analysis in rock engineering , 1996 .

[12]  Therese Isaksson,et al.  Model for estimation of time and cost based on risk evaluation applied on tunnel projects , 2002 .

[13]  Z. S. Xu,et al.  An overview of operators for aggregating information , 2003, Int. J. Intell. Syst..

[14]  Kwang-Ho You,et al.  Risk analysis for determination of a tunnel support pattern , 2005 .

[15]  Suzanne Lacasse,et al.  Quantitative vulnerability estimation for scenario-based landslide hazards , 2010 .

[16]  Abdallah I. Husein Malkawi,et al.  Uncertainty and reliability analysis applied to slope stability , 2000 .

[17]  R. Soeters,et al.  LANDSLIDES: INVESTIGATION AND MITIGATION. CHAPTER 8 - SLOPE INSTABILITY RECOGNITION, ANALYSIS, AND ZONATION , 1996 .

[18]  M. Terlien,et al.  Prediction of the occurrence of slope instability phenomenal through GIS-based hazard zonation , 1997 .

[19]  Sung-Eun Cho,et al.  Effects of spatial variability of soil properties on slope stability , 2007 .

[20]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[21]  Fausto Guzzetti,et al.  Landslide fatalities and the evaluation of landslide risk in Italy , 2000 .

[22]  James Bent,et al.  Effective Project Management Through Applied Cost and Schedule Control , 1996 .

[23]  R. H. Myers,et al.  Probability and Statistics for Engineers and Scientists , 1978 .

[24]  Raul Flores Peñalba,et al.  Framework for probabilistic assessment of landslide: a case study of El Berrinche , 2009 .

[25]  Yeou-Koung Tung,et al.  Uncertainty and reliability analysis , 1995 .