Paste Tailings Management

[1]  Emmanuel I. Iwuoha,et al.  Passive neutralisation of acid mine drainage by fly ash and its derivatives: A column leaching study , 2008 .

[2]  Andy Fourie,et al.  Development of Specimen Curing Procedures that Account for the Influence of Effective Stress During Curing on the Strength of Cemented Mine Backfill , 2011 .

[3]  P. Simms,et al.  Direct measurement of matric suction in triaxial tests on early-age cemented paste backfill , 2009 .

[4]  Mw Grabinsky,et al.  Monitoring barricade performance in a cemented paste backfill operation , 2010 .

[5]  F. W. Brackebusch,et al.  Basics of paste backfill systems , 1995 .

[6]  Erol Yilmaz,et al.  Advances in reducing large volumes of environmentally harmful mine waste rocks and tailings , 2011 .

[7]  T. Deschamps,et al.  Laboratory study of surface paste disposal for sulfidic tailings: Physical model testing , 2011 .

[8]  On-Site Backfill Slurry Characterisation Tests at Boulby Mine – A Case Study , 2002 .

[9]  A. Li Stability of Large Thickened , Non-Segregated Tailings Slopes , 2018 .

[10]  R. G. McGregora,et al.  The physical , chemical and mineralogical properties of three cemented layers within sulfide-bearing mine tailings , 2002 .

[11]  M. Vincent,et al.  LARGE SCALE APPLICATIONS OF COVERS WITH CAPILLARY BARRIER EFFECTS TO CONTROL THE PRODUCTION OF ACID MINE DRAINAGE , 2005 .

[12]  G. Blight,et al.  The behaviour of mine tailings during hydraulic deposition , 1983 .

[13]  D. F. James,et al.  Flow behaviour of tailings paste for surface disposal , 2005 .

[14]  Mamadou Fall,et al.  Shear behaviour of cemented pastefill-rock interfaces , 2008 .

[15]  Bayram Ercikdi,et al.  Assessment of strength properties of cemented paste backfill by ultrasonic pulse velocity test. , 2014, Ultrasonics.

[16]  Mw Grabinsky,et al.  In situ measurements of cemented paste backfill at the Cayeli Mine , 2012 .

[17]  Erol Yilmaz,et al.  Influence of disposal configurations on hydrogeological behaviour of sulphidic paste tailings: A field experimental study , 2014 .

[18]  Erol Yilmaz Geotechnical Characterization of Cemented Paste Backfill , 2015 .

[19]  Othman Nasir,et al.  Mechanical Behaviour of the Interface Between Cemented Tailings Backfill and Retaining Structures Under Shear Loads , 2010 .

[20]  Mamadou Fall,et al.  Saturated hydraulic conductivity of cemented paste backfill , 2009 .

[21]  D H Zou,et al.  Suitability of mine tailings for shotcrete as a ground support , 2004 .

[22]  Rajdeep Das,et al.  Waste management in mining industry , 2013 .

[23]  Craig Vogt,et al.  International Assessment of Marine and Riverine Disposal of Mine Tailings , 2012 .

[24]  William F. Bawden,et al.  Field properties of cemented paste backfill at the Golden Giant mine , 2005 .

[25]  Ayhan Kesimal,et al.  The effect of desliming by sedimentation on paste backfill performance , 2003 .

[26]  Dynamic imaging and modelling of multilayer deposition of gold paste tailings , 2009 .

[27]  Michel Aubertin,et al.  Microstructural and geochemical evolution of paste tailings in surface disposal conditions , 2008 .

[28]  Tikou Belem,et al.  Chemical factors that influence the performance of mine sulphidic paste backfill , 2002 .

[29]  D. A. Landriault,et al.  Paste backfill study for deep mining at Kidd Creek , 2000 .

[30]  J. Cayouette,et al.  Optimization of the paste backfill plant at Louvicourt mine , 2003 .

[31]  K. Klein,et al.  Electromagnetic Properties of Cemented Paste Backfill , 2006 .

[32]  James Doherty,et al.  Investigation of some controllable factors that impact the stress state in cemented paste backfill , 2015 .

[33]  Roger White,et al.  Paste – The Future of Tailings Disposal ? , 2001 .

[34]  Andy Fourie,et al.  Some aspects of the mechanics of arching in backfilled stopes , 2009 .

[35]  F. Hassani,et al.  Hydro-mechanical evaluation of stabilized mine tailings , 2002 .

[36]  M. Grabinsky,et al.  Electromagnetic wave-based measurement techniques to study the role of Portland cement hydration in cemented paste backfill materials , 2012 .

[37]  Erol Yilmaz,et al.  Effects of curing and stress conditions on hydromechanical, geotechnical and geochemical properties of cemented paste backfill , 2014 .

[38]  P. Marion,et al.  Environmental desulphurization of four Canadian mine tailings using froth flotation , 2000 .

[39]  Andy Fourie,et al.  Assessment of the self-desiccation process in cemented mine backfills , 2007 .

[40]  Erol Yilmaz,et al.  Effect of curing under pressure on compressive strength development of cemented paste backfill , 2009 .

[41]  R. Pakalnis,et al.  Composite paste barricade performance at Goldcorp Inc. Red Lake Mine, Ontario, Canada , 2010 .

[42]  P. Simms,et al.  Generic modelling of desiccation for cyclic deposition of thickened tailings to maximise density and to minimise oxidation , 2010 .

[43]  Robert J. Mitchell,et al.  Model studies on cemented tailings used in mine backfill , 1982 .

[44]  W. F. Bawden,et al.  In-situ Monitoring of Cemented Paste Backfill , 2011 .

[45]  L. Huynh,et al.  Effect of polyphosphate and naphthalene sulfonate formaldehyde condensate on the rheological properties of dewatered tailings and cemented paste backfill , 2006 .

[46]  Tikou Belem,et al.  The effect of microstructural evolution on the physical properties of paste Backfill , 2001 .

[47]  R. W. Lawrence,et al.  A method to calculate the neutralization potential of mining wastes , 1997 .

[48]  Gaylon S. Campbell,et al.  Water content, hydraulic conductivity, and ice formation in winter stems of Pinus contorta: a TDR case study , 2001, Oecologia.

[49]  P. Simms,et al.  Modelling evaporation of paste tailings from the Bulyanhulu mine , 2007 .

[50]  Ayhan Kesimal,et al.  Effect of properties of tailings and binder on the short-and long-term strength and stability of cemented paste backfill , 2005 .

[51]  Tikou Belem,et al.  A contribution to understanding the hardening process of cemented pastefill , 2004 .

[52]  J. Theriault,et al.  Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine , Tanzania , 2003 .

[53]  G. M. Ritcey Tailings management in gold plants , 2005 .

[54]  Rens B. M. Verburg,et al.  USE OF PASTE TECHNOLOGY FOR TAILINGS DISPOSAL: POTENTIAL ENVIRONMENTAL BENEFITS AND REQUIREMENTS FOR GEOCHEMICAL CHARACTERIZATION , 2001 .

[55]  Andy Fourie,et al.  Behavior of Cemented Paste Backfill in Two Mine Stopes: Measurements and Modeling , 2011 .

[56]  Nagaratnam Sivakugan,et al.  A laboratory model to study arching within a hydraulic fill stope , 2007 .

[57]  D. V. Boger,et al.  Application of rheology to solving tailings disposal problems , 1998 .

[58]  Bern Klein,et al.  Design and evaluation of mixtures of mine waste rock and tailings , 2006 .

[59]  M. Aubertin,et al.  Reactivity and mineralogical evolution of an underground mine sulphidic cemented paste backfill , 2006 .

[60]  Li Li,et al.  Formulation of a three dimensional analytical solution to evaluate stresses in backfilled vertical narrow openings , 2005 .

[61]  K. Klein,et al.  Effect of specimen composition on the strength development in cemented paste backfill , 2006 .

[62]  Di Wu,et al.  Numerical modelling of thermally and hydraulically coupled processes in hydrating cemented tailings backfill columns , 2014 .

[63]  K. Xia,et al.  Dynamic tests of cemented paste backfill: effects of strain rate, curing time, and cement content on compressive strength , 2011, Journal of Materials Science.

[64]  Bayram Ercikdi,et al.  Predicting the uniaxial compressive strength of cemented paste backfill from ultrasonic pulse velocity test , 2016 .

[65]  Lyne Daigle,et al.  The influence of temperature on earth pressure cell readings , 2004 .

[66]  Phil Newman,et al.  SURFACE PASTE DISPOSAL OF HIGH-SULFIDE TAILINGS - FIELD CELL MONITORING AND PILOT PLANT TESTING 1 , 2006 .

[67]  T. Belem,et al.  A laboratory study of the behaviour of surface paste disposal , 2004 .

[68]  Jamie Archibald,et al.  Compilation of industry practices for control of hazards asso- ciated with backfill in underground mines-Part II underground transport and stope placement , 2009 .

[69]  M. Aubertin,et al.  Measurement and prediction of internal stresses in an underground opening during its filling with cemented fill , 2004 .

[70]  W. F. Bawden,et al.  In-situ measurements of cemented paste backfill in long-hole stopes , 2009 .

[71]  Mw Grabinsky In situ monitoring for ground truthing paste backfill designs , 2010 .

[72]  Tg Fitton,et al.  Surface Disposal of Paste and Thickened Tailings — A Brief History and Current Confronting Issues , 2008 .

[73]  B. Bussière Colloquium 2004: Hydrogeotechnical properties of hard rock tailings from metal mines and emerging geoenvironmental disposal approaches , 2007 .

[74]  K. Been,et al.  Soil Liquefaction and Paste Tailings , 2009 .