Energy cost optimisation in two-machine Bernoulli serial lines under time-of-use pricing

Energy cost optimisation in manufacturing systems has gained more and more attention. Although there are many papers about energy consumption optimisation in serial production lines, energy cost op...

[1]  Jingshan Li,et al.  Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers , 2020, Int. J. Prod. Res..

[2]  Chao-Bo Yan,et al.  Analysis and Optimization of Energy Consumption in Two-Machine Bernoulli Lines With General Bounds on Machine Efficiency , 2021, IEEE Transactions on Automation Science and Engineering.

[3]  Ignacio E. Grossmann,et al.  Integrated scheduling of rolling sector in steel production with consideration of energy consumption under time-of-use electricity prices , 2018, Comput. Chem. Eng..

[4]  Jingshan Li,et al.  Reducing energy consumption in serial production lines with Bernoulli reliability machines , 2017, Int. J. Prod. Res..

[5]  Chao-Bo Yan,et al.  Formulation and Solution Methodology for Reducing Energy Consumption in Two-Machine Bernoulli Serial Lines , 2022, IEEE Transactions on Automation Science and Engineering.

[6]  Thomas H. Bradley,et al.  The Efficacy of Electric Vehicle Time-of-Use Rates in Guiding Plug-in Hybrid Electric Vehicle Charging Behavior , 2012, IEEE Transactions on Smart Grid.

[7]  Feng Gao,et al.  Energy Cost optimization in Two-Machine Bernoulli Serial Lines Under Time-of-Use Pricing , 2019, 2019 IEEE 15th International Conference on Automation Science and Engineering (CASE).

[8]  Tibor Kolta Selecting Equipment to Control Air Pollution from Automotive Painting Operations , 1992 .

[9]  Chao-Bo Yan,et al.  Energy Consumption optimization in Two-Machine Geometric Serial Lines* , 2020, 2020 IEEE 16th International Conference on Automation Science and Engineering (CASE).

[10]  Zhao Yang Dong,et al.  Electric Vehicle Route Optimization Considering Time-of-Use Electricity Price by Learnable Partheno-Genetic Algorithm , 2015, IEEE Transactions on Smart Grid.

[11]  Byung Do Chung,et al.  Bi-objective optimization approach for energy aware scheduling considering electricity cost and preventive maintenance using genetic algorithm , 2020 .

[12]  Ada Che,et al.  Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs , 2017 .

[13]  Chao-Bo Yan,et al.  A Unified Effective Method for Aggregating Multi-Machine Stages in Production Systems , 2013, IEEE Transactions on Automatic Control.

[14]  Fabrice Locment,et al.  Building-integrated microgrid: Advanced local energy management for forthcoming smart power grid communication , 2013 .

[15]  Feng Chu,et al.  An Improved Model for Parallel Machine Scheduling Under Time-of-Use Electricity Price , 2018, IEEE Transactions on Automation Science and Engineering.

[16]  Raymond Chiong,et al.  Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches , 2016, IEEE Transactions on Automation Science and Engineering.

[17]  C. Galitsky,et al.  Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry , 2008 .

[18]  Surya Santoso,et al.  Determining Time-of-Use Schedules for Electric Vehicle Loads: A Practical Perspective , 2015, IEEE Power and Energy Technology Systems Journal.

[19]  Chao-Bo Yan,et al.  An effective and efficient divide-and-conquer algorithm for energy consumption optimisation problem in long Bernoulli serial lines , 2020, Int. J. Prod. Res..

[20]  Fei Wang,et al.  Multi-Objective Optimization Model of Source–Load–Storage Synergetic Dispatch for a Building Energy Management System Based on TOU Price Demand Response , 2018, IEEE Transactions on Industry Applications.

[21]  Jingshan Li,et al.  Improving energy efficiency in Bernoulli serial lines: an integrated model , 2016 .

[22]  Qing-Shan Jia,et al.  Performance Analysis and Comparison on Energy Storage Devices for Smart Building Energy Management , 2012, IEEE Transactions on Smart Grid.

[23]  Xu Zheng,et al.  Energy-efficient scheduling for multi-objective two-stage flow shop using a hybrid ant colony optimisation algorithm , 2020, Int. J. Prod. Res..

[24]  Chao-Bo Yan,et al.  Analytical Approach to Estimate Efficiency of Series Machines in Production Lines , 2018, IEEE Transactions on Automation Science and Engineering.