Unexpected disruptions occur in the railways on a daily basis, which are typically handled manually by experienced trac controllers with the support of predened contingency plans. When several disruptions occur simultaneously, it is rather hard for trac controllers to make trac management decisions, because 1) the predened contingency plans corresponding to these disruptions may con ictwith each other and 2) no predened contingency plan considering the combined eects of all disruptions is available. This paper proposes a Mixed Integer Linear Programming (MILP) model that reschedules the timetable automatically in case of multiple simultaneous disruptions occurring at dierent geographic locations. This multiple-disruptions rescheduling model considers the interactions between service adjustments made for dierent disruptions. The combined multiple disruptions rescheduling model is applied every time an extra disruption occurs by considering all ongoing disruptions. Also, a sequential single-disruption rescheduling model is considered to handle each new disruption with the last solution as reference. A case study is performed by assuming two simultaneous disruptions occurring in part of the Dutch railways with 38 stations and 10 train lines operating half-hourly in each direction. By setting 3 minutes as the computation time limit in the considered disruption scenario, the combined approach resulted in less cancelled train services and train delays compared to the sequential approach.
[1]
Lucas P. Veelenturf,et al.
A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions
,
2014,
Transp. Sci..
[2]
Yousef Maknoon,et al.
The multi-objective railway timetable rescheduling problem
,
2017
.
[3]
Rob M.P. Goverde,et al.
Macroscopic multiple-station short-turning model in case of complete railway blockages
,
2018
.
[4]
Dennis Huisman,et al.
Assessment of alternative line plans for severe winter conditions in the Netherlands
,
2017,
Public Transp..
[5]
Lucas P. Veelenturf,et al.
Real-time high-speed train rescheduling in case of a complete blockage
,
2015
.
[6]
Dennis Huisman,et al.
Adjusting a railway timetable in case of partial or complete blockades
,
2012,
Eur. J. Oper. Res..
[7]
Rob M.P. Goverde,et al.
Designing alternative railway timetables under infrastructure maintenance possessions
,
2017
.
[8]
Oded Cats,et al.
Railway disruption management challenges and possible solution directions
,
2017,
Public Transp..
[9]
Rob M.P. Goverde,et al.
A microscopic model for optimal train short-turnings during complete blockages
,
2017
.