Priority nets for scheduling flexible manufacturing systems
暂无分享,去创建一个
[1] L. N. Van Wassenhove,et al. Analysis of Scheduling Rules for an FMS , 1990 .
[2] Oded Maimon,et al. Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines , 1988, Oper. Res..
[3] Ludo Gelders,et al. A review of FMS planning models , 1986 .
[4] Trevor Mudge,et al. Hierarchical decomposition and simulation of manufacturing cells using Ada , 1986 .
[5] Moshe M. Barash,et al. Operational control of item flow in versatile manufacturing systems , 1979 .
[6] M. M. Kaye,et al. Applying simulation and expert systems to the control of advanced manufacturing facilities , 1990 .
[7] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[8] P. J. Schweitzer,et al. Analysis of flexible manufacturing systems with priority scheduling: PMVA , 1985 .
[9] Hoda A. ElMaraghy. Simulation and graphical animation of advanced manufacturing systems , 1982 .
[10] Kazuaki Iwata,et al. Simulation for Design and Operation of Manufacturing Systems , 1984 .
[11] Pius J. Egbelu,et al. Characterization of automatic guided vehicle dispatching rules , 1984 .
[12] Colin L. Moodie,et al. Knowledge-based scheduling under unpredicted conditions: two approaches∗ , 1989 .
[13] Madhan Shridhar Phadke,et al. Quality Engineering Using Robust Design , 1989 .
[14] George Chryssolouris,et al. The use of neural networks in determining operational policies for manufacturing systems , 1991 .
[15] Gérard Roucairol,et al. FIFO-Nets , 1986, Advances in Petri Nets.
[16] Gerd Finke,et al. MODELING AND SOLVING THE FLEXIBLE FORGING MODULE SCHEDULING PROBLEM , 1987 .