Application of fault tree analysis to assess inventory risk: a practical case from aerospace manufacturing

In this case study, an aerospace manufacturer seeks to decrease inventory and improve its turnover rate using fault tree analysis (FTA). Historically, the company controlled its inventory using material capacity planning, material requirement planning modules provided as part of Enterprise Resource Planning and a self-developed inventory management system. Historical data indicated a rising trend in the inventory turnover rate, and the total inventory cost is substantial, up to US$260 million. This study uses a FTA approach to prioritise improvement options on the basis of risk reduction. Study results showed that risk-based decision-making, supported by FTA, is useful in handling the inventory problem. Inventory turnover rate indicates that inventory level has been improved 30% using the FTA.

[1]  Christopher S. Tang Perspectives in supply chain risk management , 2006 .

[2]  Seung Ju Lee,et al.  Fault tree analysis on handwashing for hygiene management. , 2009 .

[3]  Frank Ortmeier,et al.  Formal Fault Tree Analysis - Practical Experiences , 2007, Electron. Notes Theor. Comput. Sci..

[4]  Gerd Szwillus,et al.  Combining task analysis and fault tree analysis for accident and incident analysis: a case study from Bulgaria. , 2009, Accident; analysis and prevention.

[5]  Sungjoo Lee,et al.  Application of fault tree analysis to the service process: service tree analysis approach , 2009 .

[6]  W. E. Vesely,et al.  NEW METHODOLOGY FOR OBTAINING CUT SETS FOR FAULT TREES. , 1972 .

[7]  Yoshinobu Sato,et al.  Quantification of sequential failure logic for fault tree analysis , 2000, Reliab. Eng. Syst. Saf..

[8]  Ching-Hsue Cheng,et al.  Using intuitionistic fuzzy sets for fault-tree analysis on printed circuit board assembly , 2006, Microelectron. Reliab..

[9]  Lars Rosén,et al.  Fault tree analysis for integrated and probabilistic risk analysis of drinking water systems. , 2009, Water research.

[10]  Peng Sun,et al.  Risk Aversion in Inventory Management , 2007, Oper. Res..

[11]  Tony Wild Best Practice in Inventory Management , 1997 .

[12]  Jiangao Deng,et al.  Constructing a Risk Management Mechanism Model of ERP Project Implementation , 2008, 2008 International Conference on Information Management, Innovation Management and Industrial Engineering.

[13]  Bi-Huei Tsai,et al.  The Impact of Enterprise Resource Planning Systems on the Efficiency of Taiwanese Firms , 2008, 2008 IEEE Asia-Pacific Services Computing Conference.

[14]  Dong Yuhua,et al.  Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis , 2005 .

[15]  C. Julius Wang,et al.  What Every Engineer Should Know about Reliability and Risk Analysis , 1993 .

[16]  W E Vesely,et al.  Fault Tree Handbook , 1987 .

[17]  J. Stoker,et al.  The Department of Health and Human Services. , 1999, Home healthcare nurse.

[18]  M Haralanova,et al.  A case study: Bulgaria. , 1991, The Proceedings of the Nutrition Society.