Heuristic approaches for mixed-model sequencing problem with stochastic processing times
暂无分享,去创建一个
[1] Uğur Özcan,et al. A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem , 2011 .
[2] André Rossi,et al. Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations , 2016, Discret. Appl. Math..
[3] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[4] Lei Yang,et al. A Hybrid Immune Algorithm for Sequencing the Mixed-Model Assembly Line with Variable Launching Intervals , 2010, ICICA.
[5] Ihsan Sabuncuoglu,et al. Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling , 2008, Eur. J. Oper. Res..
[6] J. A. Bondy,et al. Graph Theory with Applications , 1978 .
[7] S. Afshin Mansouri,et al. A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines , 2005, Eur. J. Oper. Res..
[8] Alexandre Dolgui,et al. A decomposition based solution algorithm for U-type assembly line balancing with interval data , 2015, Comput. Oper. Res..
[9] Alexandre Dolgui,et al. An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times , 2015 .
[10] Alexandre Dolgui,et al. Stability radius of the optimal assembly line balance with fixed cycle time , 2001, ETFA 2001. 8th International Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.01TH8597).
[11] C. Ireland. Fundamental concepts in the design of experiments , 1964 .
[12] Alysson M. Costa,et al. Sequencing mixed-model assembly lines operating with a heterogeneous workforce , 2015 .
[13] Alexandre Dolgui,et al. Robust balancing of straight assembly lines with interval task times , 2013, J. Oper. Res. Soc..
[14] Joaquín Bautista,et al. Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules , 2011, Eur. J. Oper. Res..
[15] Xiaoqiang Cai,et al. Scheduling stochastic jobs with asymmetric earliness and tardiness penalties , 1997 .
[16] Semra Tunali,et al. A review of the current applications of genetic algorithms in mixed-model assembly line sequencing , 2011 .
[17] Yeongho Kim,et al. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines , 2006, Eur. J. Oper. Res..
[18] Yeongho Kim,et al. A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .
[19] Armin Jabbarzadeh,et al. A new approach to solve a mixed-model assembly line with a bypass subline sequencing problem , 2011 .
[20] Nils Boysen,et al. Sequencing mixed-model assembly lines to minimise the number of work overload situations , 2011 .
[21] Yeongho Kim,et al. A Coevolutionary Algorithm for Balancing and Sequencing in Mixed Model Assembly Lines , 2000, Applied Intelligence.
[22] Kurt Mehlhorn,et al. Review of algorithms and data structures: the basic toolbox by Kurt Mehlhorn and Peter Sanders , 2011, SIGA.
[23] Alexandre Dolgui,et al. Stability analysis of an optimal balance for an assembly line with fixed cycle time , 2006, Eur. J. Oper. Res..
[24] John Miltenburg,et al. Balancing and Scheduling Mixed-Model U-Shaped Production Lines , 2002 .
[25] Mohsen Salehi,et al. Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval , 2009 .
[26] J. Pontious,et al. The Assembly Line. , 2015, The Journal of the Oklahoma State Medical Association.
[27] L. Tsai. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .
[28] Joaquín Bautista,et al. A scatter search based hyper-heuristic for sequencing a mixed-model assembly line , 2010, J. Heuristics.
[29] E. M. Dar-El,et al. A mixed-model sequencing application , 1981 .
[30] Nils Boysen,et al. On the part inventory model sequencing problem: complexity and Beam Search heuristic , 2011, J. Sched..
[31] Ju Hyun Chul,et al. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines , 1998, Comput. Oper. Res..
[32] 徐克林,et al. Sequencing Mixed-Model Flexible Assembly Lines with Variable Launching Intervals , 2013 .
[33] Stefan Bock,et al. Controlling mixed-model assembly lines in real-time by using distributed systems , 2006, Eur. J. Oper. Res..
[34] Tadeusz Sawik,et al. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line , 2002, Eur. J. Oper. Res..
[35] Sun Jin Kim,et al. Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm , 2000 .
[36] Rico Gujjula,et al. An efficient heuristic to sequence mixed-model assembly lines , 2010, 2010 IEEE International Conference on Industrial Engineering and Engineering Management.
[37] Jing Huang,et al. Minimizing total tardiness subject to manpower restriction in labor-intensive manufacturing cells , 2013, Math. Comput. Model..
[38] H. Lorenz,et al. Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .
[39] Ibrahim Kucukkoc,et al. Simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines , 2014 .
[40] Mostafa Zandieh,et al. Simultaneous solving of balancing and sequencing problems in mixed-model assembly line systems , 2012 .
[41] Brahim Hnich,et al. Balancing and scheduling of flexible mixed model assembly lines , 2013, Constraints.
[42] Nils Boysen,et al. Car sequencing versus mixed-model sequencing: A computational study , 2014, Eur. J. Oper. Res..
[43] Mostafa Zandieh,et al. Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines , 2012, Appl. Soft Comput..
[44] Gürsel A. Süer,et al. Effects of different fuzzy operators on fuzzy bi-objective cell loading problem in labor-intensive manufacturing cells , 2009, Comput. Ind. Eng..
[45] Alexandre Dolgui,et al. Robust Assembly Line Balancing: State of the Art and New Research Perspectives , 2014 .
[46] Alexandre Dolgui,et al. Balancing of simple assembly lines under variations of task processing times , 2012, Ann. Oper. Res..
[47] Hans-Otto Günther,et al. A heuristic based on Vogel's approximation method for sequencing mixed-model assembly lines , 2011 .
[48] Alexandre Dolgui,et al. Assembly line balancing under uncertainty: Robust optimization models and exact solution method , 2013, Comput. Ind. Eng..
[49] H.-O. Gunther,et al. Scheduling utility workers at mixed-model assembly lines , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[50] Nils Boysen,et al. Jena Research Papers in Business and Economics Production Planning of Mixed-Model Assembly Lines : Overview and Extensions , 2007 .
[51] Yuri N. Sotskov,et al. Calculation of the Stability Radius of an Optimal Line Balance , 2012 .
[52] Gürsel A. Süer,et al. Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells , 2005, Comput. Ind. Eng..
[53] Yannick Frein,et al. Exact and heuristic solutions based on dynamic programming for mixed model assembly line sequencing , 2014 .
[54] Liang Gao,et al. Metaheuristic approaches to sequencing mixed-model fabrication/assembly systems with two objectives , 2010 .
[55] George Steiner,et al. A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems , 1990 .
[56] Alexandre Dolgui,et al. Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..
[57] Edsger W. Dijkstra,et al. A note on two problems in connexion with graphs , 1959, Numerische Mathematik.
[58] Alexandre Dolgui,et al. A bibliographic review of production line design and balancing under uncertainty , 2015 .
[59] Seyed Hessameddin Zegordi,et al. Bi-objective single machine scheduling problem with stochastic processing times , 2015 .
[60] Alexandre Dolgui,et al. Dealing with uncertainty in disassembly line design , 2014 .
[61] Chaoyong Zhang,et al. Advanced scatter search approach and its application in a sequencing problem of mixed-model assembly lines in a case company , 2014 .
[62] Bhaba R. Sarker,et al. Designing a mixed-model assembly line to minimize the costs of idle and utility times , 1998 .
[63] Jinlin Li,et al. Balancing manual mixed-model assembly lines using overtime work in a demand variation environment , 2014 .
[64] Elwood S. Buffa,et al. Graph Theory with Applications , 1977 .
[65] Leonie Kohl,et al. Fundamental Concepts in the Design of Experiments , 2000 .
[66] Nils Boysen,et al. Level Scheduling for batched JIT supply , 2009 .
[67] Jaime Cano-Belm. A Scatter Search Based Hyper-Heuristic for Sequencing a Mixed-Model Assembly Line , 2009 .
[68] R Tavakkoli Moghaddam,et al. MULTI-CRITERIA SEQUENCING PROBLEM FOR A MIXED-MODEL ASSEMBLY LINE IN A JIT PRODUCTION SYSTEM , 2006 .
[69] Tianyuan Xiao,et al. Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time , 2014 .
[70] Katsuhisa Ohno,et al. Modeling and analysis of a mixed‐model assembly line with stochastic operation times , 2007 .
[71] Nick T. Thomopoulos,et al. Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .
[72] Jing Huang,et al. Heuristic procedures and mathematical models for cell loading and scheduling in a shoe manufacturing company , 2009, Comput. Ind. Eng..
[73] Takayoshi Tamura,et al. Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line , 2011 .
[74] Alexandre Dolgui,et al. Enumerations and stability analysis of feasible and optimal line balances for simple assembly lines , 2015, Comput. Ind. Eng..