Causes of Road and Bridge Construction Claims: Analysis of Colorado Department of Transportation Projects

AbstractRoad and highway construction projects are plagued by unanticipated conditions and changes, which cause claims and cost overruns due to diverse causes. This study identified a set of project factors that might affect the rate of claim occurrence in different projects and used data from Colorado Department of Transportation projects to test the potential causes of claims to assess which project management attributes are most likely to lead to claims. A total of 780 projects were selected from a data set of 1,060 projects completed in a time window from 1997 to 2012. These showed 213 claims within a subset of 62 claim-contained projects. Results showed that delays are the main cause of claims in the projects studied and are more important than the effects of added items and change orders. The study also showed that projects with fixed completion date schedules are more susceptible to claims than projects with more flexible schedules. Actions indicated are for transportation project planners to adopt...

[1]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[2]  Francis T. Hartman,et al.  Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .

[3]  H. Randolph Thomas,et al.  Managing Unforeseen Site Conditions , 1987 .

[4]  D. Hosmer,et al.  Applied Logistic Regression , 1991 .

[5]  Nancy L. Leech,et al.  SPSS for introductory statistics : use and interpretation , 2010 .

[6]  S. Washington,et al.  Statistical and Econometric Methods for Transportation Data Analysis , 2010 .

[7]  Jacob Cohen,et al.  Applied multiple regression/correlation analysis for the behavioral sciences , 1979 .

[8]  W. Thwala,et al.  An exploratory study of problems facing small contractors in the North West province of South Africa , 2009 .

[9]  S. G. Revay Can construction claims be avoided , 1993 .

[10]  GERARD DE JONG,et al.  National and International Freight Transport Models: An Overview and Ideas for Future Development , 2004 .

[11]  Kenneth King Humphreys,et al.  Control and Management of Capital Projects , 1965 .

[12]  Issaka Ndekugri,et al.  Disputing the existence of a dispute as a strategy for avoiding construction adjudication , 2006 .

[13]  Angus Reid,et al.  Common sense applied to the definition of a dispute , 2013 .

[14]  James E. Diekmann,et al.  Concurrent delays in construction projects , 1987 .

[15]  Henry L. Michel THE NEXT 25 YEARS: THE FUTURE OF THE CONSTRUCTION INDUSTRY , 1998 .

[16]  James E. Diekmann,et al.  Construction Claims: Frequency and Severity , 1985 .

[17]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.