The application of data mining in erw weld pipe scheduling based on decision tree
暂无分享,去创建一个
As the development of enterprise information, the common problem turns out, that is how to get valuable information from huge database. In this paper it is confirmed that it is feasible and scientific to apply data mining into ERW weld pipe scheduling. The research result will not only provide decision support to ERW weld pipe production management but also supply a new method to optimize production scheduling.
[1] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[2] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..
[3] S. D. Lee,et al. Production lot sizing in failure prone two-stage serial systems , 2000, Eur. J. Oper. Res..
[4] 이철,et al. 안정화 기간을 고려한 Economic Lot Scheduling Problem , 1995 .