The Distributed Parallel Machine and Assembly Scheduling Problem with eligibility constraints
暂无分享,去创建一个
[1] Andrew Y. C. Nee,et al. Web-based Multi-functional Scheduling System for a Distributed Manufacturing Environment , 2002, Concurr. Eng. Res. Appl..
[2] Andrew Y. C. Nee,et al. A modified genetic algorithm for distributed scheduling problems , 2003, J. Intell. Manuf..
[3] Sai Ho Chung,et al. An adaptive genetic algorithm with dominated genes for distributed scheduling problems , 2005, Expert Syst. Appl..
[4] Sara Hatami,et al. The Distributed Assembly Permutation Flowshop Scheduling Problem , 2013 .
[5] Shih-Wei Lin,et al. Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm , 2013 .
[6] J. Framiñan,et al. A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem , 2015 .
[7] Wenhua Li,et al. Parallel machine scheduling of machine-dependent jobs with unit-length , 2004, Eur. J. Oper. Res..
[8] Navid Sahebjamnia,et al. Modeling an e-based real-time quality control information system in distributed manufacturing shops , 2008, Comput. Ind..
[9] C. Sung,et al. A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times , 2008 .
[10] Chung-Yee Lee,et al. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .
[11] Ling Wang,et al. An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem , 2013 .
[12] Rubén Ruiz,et al. The distributed permutation flowshop scheduling problem , 2010, Comput. Oper. Res..
[13] Hang Lei,et al. Minimizing the total completion time in a distributed two stage assembly system with setup times , 2014, Comput. Oper. Res..
[14] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[15] Rubén Ruiz,et al. A scatter search algorithm for the distributed permutation flowshop scheduling problem , 2014, Eur. J. Oper. Res..
[16] Andrew Y. C. Nee,et al. Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems , 2007, Comput. Ind. Eng..
[17] C. Potts,et al. A branch and bound algorithm for the two-stage assembly scheduling problem , 1997 .
[18] Xi Sun,et al. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling , 2003, Eur. J. Oper. Res..
[19] Jatinder N. D. Gupta,et al. Comparative evaluation of MILP flowshop models , 2005, J. Oper. Res. Soc..
[20] Manoj Kumar Tiwari,et al. Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach , 2006 .
[21] Peter Butala,et al. A multi-agent approach to process planning and fabrication in distributed manufacturing , 1998 .
[22] Alain Bernard,et al. Product Variety Management , 1998 .