Optimized Planning for Hybrid Microgrid in Grid- Connected Mode

The emergence of the Distributed Generation (DG) units along with their application in the distribution system level has led to the establishment of microgrids. microgrids are a part of the distribution network in which, in addition to the loads, there are micro sources operating in two modes, i.e. grid-connected mode and island also known as standalone mode. In the grid-connected mode, the load is supplied through local DG units, and if necessary, power is exchanged with the upstream grid, concerned as well. Considering the development of DG units technology in recent years which in turn, has led to the expansion of microgrid concept, microgrid planning meaning determining the capacities of local DG units assumes an extraordinary significance, taking the technical, economic and environmental considerations into account. This research tries to study the optimized planning for a grid-connected hybrid microgrid. The case study was conducted in Razi University in Kermanshah, Iran (34°23'Nlatitude and 47°6'E longitude). Due to the stochastic behavior of renewable energies based DG units, the uncertainties about the amount of generated power from these resources are considered using appropriate probability density functions. The problem is a Mixed Integer Non-linear Program (MINLP), to be solved by means of GAMS software. In order to bring about optimized results, microgrid simulation is processed in assorted scenarios, both in probabilistic and deterministic modes. In the end, the results are compared to those resulted from Homer Energy software. KeywordsOptimized Planning, Hybrid microgrid, Probability Functions, Uncertainty, Distributed Generation

[1]  W. El-khattam,et al.  Optimal investment planning for distributed generation in a competitive electricity market , 2004, IEEE Transactions on Power Systems.

[2]  Orhan Ekren,et al.  Size optimization of a PV/wind hybrid energy conversion system with battery storage using simulated annealing , 2010 .

[3]  John K. Kaldellis,et al.  Optimum sizing of photovoltaic-energy storage systems for autonomous small islands , 2010 .

[4]  Heikki N. Koivo,et al.  System modelling and online optimal management of MicroGrid using Mesh Adaptive Direct Search , 2010 .

[5]  Rachid Ibtiouen,et al.  Sizing optimization of grid-independent hybrid photovoltaic/wind power generation system , 2011 .

[6]  Lingfeng Wang,et al.  PSO-Based Multi-Criteria Optimum Design of A Grid-Connected Hybrid Power System With Multiple Renewable Sources of Energy , 2007, 2007 IEEE Swarm Intelligence Symposium.

[7]  S. P. Chowdhury,et al.  Economic analysis of PV/diesel hybrid power systems in different climatic zones of South Africa , 2012 .

[8]  Fang Zheng Peng,et al.  Control for Grid-Connected and Intentional Islanding Operations of Distributed Power Generation , 2011, IEEE Transactions on Industrial Electronics.

[9]  Rahula A. Attalage,et al.  Sensitivity of internal combustion generator capacity in standalone hybrid energy systems , 2012 .

[10]  Mohsen Kalantar,et al.  Allocation of solar units to reduce annual costs of the distribution system , 2013, 2013 13th International Conference on Environment and Electrical Engineering (EEEIC).

[11]  Zong Woo Geem,et al.  Size optimization for a hybrid photovoltaic–wind energy system , 2012 .

[12]  N.P. Padhy,et al.  Unit commitment-a bibliographical survey , 2004, IEEE Transactions on Power Systems.

[13]  Ziyad M. Salameh,et al.  Methodology for optimally sizing the combination of a battery bank and PV array in a wind/PV hybrid system , 1996 .

[14]  K. Uezato,et al.  A fast technique for unit commitment problem by extended priority list , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).

[15]  Giri Venkataramanan,et al.  Optimal unit sizing for a hybrid wind/photovoltaic generating system , 1996 .

[16]  Antonio J. Conejo,et al.  A clipping-off interior-point technique for medium-term hydro-thermal coordination , 1999 .

[17]  J. A. Carta,et al.  A review of wind speed probability distributions used in wind energy analysis: Case studies in the Canary Islands , 2009 .

[18]  G. C. Seeling-Hochmuth A combined optimisation concet for the design and operation strategy of hybrid-PV energy systems , 1997 .

[19]  A. Conejo,et al.  A parallel repair genetic algorithm to solve the unit commitment problem , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).

[20]  S. M. Moghaddas-Tafreshi,et al.  Optimal sizing of a stand-alone hybrid power system via particle swarm optimization for Kahnouj area in south-east of Iran , 2009 .