Investigation of the Supply Chain of Prefabricated Wooden Doors

This study focused on pre-fabricated wooden doors and their supply chain, which have all of its components pre-assembled by the supplier. The literature indicates that supply chain management in construction has four roles. One concerns the transfer of activities from the site to the supply chain to take advantage of better conditions at the fabricator‘s end. This role assumes that fabricators are in a better environment to perform certain tasks and deliver better products that can be quickly installed on site, as the product is pre-assembled. This is the first working hypothesis tested in study. A second working hypothesis is that off-site prefabricated doors have short lead times for fabrication and on-site installation and present fewer problems during installation when compared to traditional doors. The two-phase research comprised a preliminary study and two in-depth case studies about pre-fabricated wooden doors. Wooden doors presented problems related to the installation and final product quality regardless of the type of project. Some advantages of prefabricated elements were lost due lack of trust between contractors and suppliers, lack of consideration of preconditions necessary for successful site installation, and lack of standardization and tolerance management resulted in suboptimal solutions during the installation phase.

[1]  Colin Milberg TOLERANCE CONSIDERATIONS IN WORK STRUCTURING , 2007 .

[2]  Kerry London,et al.  Construction Supply Chain Modeling: Issues and Perspectives , 2008 .

[3]  Gul Polat,et al.  Construction Supply Chains: Turkish Supply Chain Configurations for Cut and Bent Rebar , 2003 .

[4]  Eddy M. Rojas,et al.  RESEARCH VALIDATION IN THE CONSTRUCTION DOMAIN , 2009 .

[5]  Scott Fernie,et al.  Making sense of supply chain management: a comparative study of aerospace and construction , 2005 .

[6]  J. Whitney Case Study Research , 1999 .

[7]  Thais da Costa,et al.  Buffering Practices in HVAC Ductwork Supply Chains , 2005 .

[8]  Jean Hartley,et al.  Case study research , 2004 .

[9]  Carlos Torres Formoso,et al.  Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts , 2008 .

[10]  Scott Fernie,et al.  Exploring change in construction: supply chain management , 2007 .

[11]  Mohamed Al-Hussein,et al.  Development of Lean Model for House Construction Using Value Stream Mapping , 2009 .

[12]  Iris D. Tommelein,et al.  Value Stream Mapping for Make-to-Order Products in a Job Shop Environment , 2005 .

[13]  Patricia Stella Pucharelli Fontanini,et al.  Mentalidade enxuta no fluxo de suprimentos da construção civil : aplicação de macro-mapeamento na cadeia de fornecedores de esquadrias de aluminio , 2004 .

[14]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[15]  A. Akintoye,et al.  A survey of supply chain collaboration and management in the UK construction industry , 2000 .

[16]  Kerry London,et al.  Construction Supply Chain Management Handbook , 2008 .

[17]  A. Posner Learning to see. , 1955, Eye, ear, nose & throat monthly.

[18]  P. James,et al.  A review of the progress towards the adoption of supply chain management (SCM) relationships in construction , 2002 .

[19]  Yong-Woo Kim,et al.  Supply Chain Costs Analysis Using Activity-Based Costing: Case Study in Rebar Supply , 2009 .

[20]  Patrick X.W. Zou,et al.  Construction Supply Chain Management Handbook , 2009 .

[21]  Tomaso Poggio,et al.  Learning to see , 1996 .

[22]  K. London,et al.  An industrial organization economic supply chain approach for the construction industry: a review , 2001 .

[23]  Christine Pasquire,et al.  Design for Manufacture and Assembly , 2003 .

[24]  Iris D. Tommelein,et al.  VALUE STREAM ANALYSIS OF CONSTRUCTION SUPPLY CHAINS: CASE STUDY ON PIPE SUPPORTS USED IN POWER PLANTS , 2002 .

[25]  Iris D. Tommelein,et al.  Application of Tolerance Analysis and Allocation to Work Structuring: Partition Wall Case , 2003 .

[26]  Alistair G.F. Gibb,et al.  What Should You Really Measure If You Want to Compare Pre-fabrication with Traditional Construction? , 2005 .