Priority Scheduling Rules for Repairable Inventory Systems

Improved priority scheduling rules are presented for a repair shop supporting a multi-item repairable inventory system with a hierarchical product structure. A variety of scheduling rules are evaluated using a simulation of a representative shop and product structure. The results indicate that dynamic rules which use inventory status information perform better than other dynamic or static rules which ignore inventory status; moreover, dynamic rules which use work-in-process inventory information outperform dynamic rules which ignore work-in-process inventory levels. In the simulation, the use of improved scheduling rules provides performance equivalent to a 20% reduction in spares inventory.

[1]  Rupert G. Miller Simultaneous Statistical Inference , 1966 .

[2]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[3]  William L. Maxwell,et al.  Multiple‐factor rules for sequencing with assembly constraints , 1968 .

[4]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[5]  James E. Day,et al.  Review of sequencing research , 1970 .

[6]  Jack P. C. Kleijnen,et al.  The Use of Multiple Ranking Procedures to Analyze Simulations of Management Systems: A Tutorial , 1972 .

[7]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[8]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[9]  A. Alan B. Pritsker,et al.  Gasp iv simulation language , 1974 .

[10]  Francois Lureau A Queueing Theoretic Analysis of Logistics Repair Models with Spare Units. , 1974 .

[11]  James V. Jucker,et al.  POLICY‐COMPARING SIMULATION EXPERIMENTS: DESIGN AND ANALYSIS , 1975 .

[12]  William L. Berry,et al.  Critical Ratio Scheduling: An Experimental Analysis , 1975 .

[13]  J. Muckstadt The Consolidated Support Model: A Three-Echelon, Multi-Item Model for Recoverable Items , 1976 .

[14]  Donald Gross,et al.  Queueing Models for Spares Provisioning. , 1977 .

[15]  Note---Author's Reply to Graves' Note on the Paper “Critical Ratio Scheduling: An Experimental Analysis” , 1977 .

[16]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[17]  Stephen C. Graves Note---A Note on “Critical Ratio Scheduling: An Experimental Analysis” , 1977 .

[18]  John A. Muckstadt Some approximations in multi‐item, multi‐echelon inventory systems for recoverable items , 1978 .

[19]  Donald Gross,et al.  Spares Provisioning for a Heterogeneous Population , 1978 .

[20]  Donald Gross,et al.  Spares Provisioning for Repairable Items: Cyclic Queues in Light Traffic. , 1978 .

[21]  D Sculli Priority dispatching rules in job shops with assembly operations and random delays , 1980 .

[22]  D. Gross On the Ample Service Assumption of Palm's Theorem in Inventory Modeling , 1982 .