Semi-Empirical Method of Hall Thrusters Lifetime Prediction
暂无分享,去创建一个
[1] V. Baranov,et al. The Wear of the Channel Walls in Hall Thrusters , 2001 .
[2] Michael Day,et al. Preliminary study of possibility to ensure large enough lifetime of SPT operating under increased powers , 1997 .
[3] Alexander Semenkin,et al. STATE OF THE ART AND PROSPECTS OF ELECTRIC PROPULSION IN RUSSIA , 2003 .
[4] Laurent Jolivet,et al. Development of the Accelerated Test Procedure for the SPT Discharge Chamber Wall Wearing During Long Thruster Operation , 2003 .
[5] I. Boyd,et al. Predicting Hall Thruster Operational Lifetime , 2004 .
[6] Mark A. Cappelli,et al. Wall Erosion in 2D Hall Thruster Simulations , 2006 .