A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems

Abstract The problem of planning, scheduling, and controlling manufacturing operations over time where constraints on available resources exist e.g. (workstations, labor, facilities, materials and equipment) is a difficult mathematical programming problem. The Resource Constrained Scheduling Problem (RCSP) as it is often referred to, is known to be NP-complete which necessitates the creation of heuristics. In this paper, a multi-level, multi-priority schema is presented which enables the user to deal with static environments but places special emphasis on quasi-dynamic scheduling environments. The polynomial time and space complexity of the heuristic together with the computational experience demonstrate the effectiveness of the quasi-dynamic heuristic.

[1]  R. DeVor,et al.  An application of multiple criteria decision making principles for planning machining operations , 1984 .

[2]  G. Doumeingts,et al.  Decision-making systems for production control planning and scheduling , 1978 .

[3]  A.H.G. Rinnooy Kan,et al.  New directions in scheduling theory , 1984 .

[4]  A. G. Lockett,et al.  Job shop scheduling heuristics and frequency of scheduling , 1982 .

[5]  Ludo Gelders,et al.  Solving a bicriterion scheduling problem , 1980 .

[6]  Juan J. Gonzalez,et al.  Master production scheduling: a multiple-objective linear programming approach , 1983 .

[7]  Kathryn E. Stecke,et al.  Design, planning, scheduling, and control problems of flexible manufacturing systems , 1985 .

[8]  Stephen C. Graves,et al.  A Review of Production Scheduling , 1981, Oper. Res..

[9]  Richard Hildebrant Scheduling flexible machining systems using mean value analysis , 1980, 1980 19th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.

[10]  Philip M. Wolfe,et al.  Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .

[11]  J. Smith,et al.  Two level heuristic for the resource constrained scheduling problem , 1986 .

[12]  Sen Tapan,et al.  A Branch-and-Bound Procedure to Solve a Bicriterion Scheduling Problem , 1983 .

[13]  Richard Weber,et al.  On the interactive solution to a multicriteria scheduling problem , 1980, Z. Oper. Research.

[14]  Florin Gheorghe Filip,et al.  Job shop scheduling optimization in real-time production control , 1983 .

[15]  R. Słowiński Multiobjective network scheduling with efficient use of renewable and nonrenewable resources , 1981 .

[16]  Victor B. Godin,et al.  Interactive Scheduling: Historical Survey and State of the Art , 1978 .

[17]  Catherine Dupont-Gatelmand A survey of flexible manufacturing systems , 1982 .

[18]  Richard F. Deckro,et al.  Multiple criteria job-shop scheduling , 1982, Comput. Oper. Res..