Towards a semantic Construction Digital Twin: Directions for future research

Abstract As the Architecture, Engineering and Construction sector is embracing the digital age, the processes involved in the design, construction and operation of built assets are more and more influenced by technologies dealing with value-added monitoring of data from sensor networks, management of this data in secure and resilient storage systems underpinned by semantic models, as well as the simulation and optimisation of engineering systems. Aside from enhancing the efficiency of the value chain, such information-intensive models and associated technologies play a decisive role in minimising the lifecycle impacts of our buildings. While Building Information Modelling provides procedures, technologies and data schemas enabling a standardised semantic representation of building components and systems, the concept of a Digital Twin conveys a more holistic socio-technical and process-oriented characterisation of the complex artefacts involved by leveraging the synchronicity of the cyber-physical bi-directional data flows. Moreover, BIM lacks semantic completeness in areas such as control systems, including sensor networks, social systems, and urban artefacts beyond the scope of buildings, thus requiring a holistic, scalable semantic approach that factors in dynamic data at different levels. The paper reviews the multi-faceted applications of BIM during the construction stage and highlights limits and requirements, paving the way to the concept of a Construction Digital Twin. A definition of such a concept is then given, described in terms of underpinning research themes, while elaborating on areas for future research.

[1]  S. Michael Spottswood,et al.  Reengineering Aircraft Structural Life Prediction Using a Digital Twin , 2011 .

[2]  Edward A. Lee,et al.  A JavaScript Extension Providing Deterministic Temporal Semantics for the Internet of Things , 2017 .

[3]  Martin Tomko,et al.  Beyond digital twins – A commentary , 2018, Environment and Planning B: Urban Analytics and City Science.

[4]  Chunhee Cho,et al.  Enhanced Machine Learning Classification Accuracy for Scaffolding Safety Using Increased Features , 2019, Journal of Construction Engineering and Management.

[5]  Julie Jupp,et al.  4D BIM for Environmental Planning and Management , 2017 .

[6]  Arash Shahi,et al.  Automated Schedule and Progress Updating of IFC-Based 4D BIMs , 2017, J. Comput. Civ. Eng..

[7]  Campbell Middleton,et al.  Structural Performance Monitoring Using a Dynamic Data-Driven BIM Environment , 2018, J. Comput. Civ. Eng..

[8]  Conrad Boton,et al.  An Innovative Framework of 5D BIM Solutions for Construction Cost Management: A Systematic Review , 2020, Archives of Computational Methods in Engineering.

[9]  XU Yusen,et al.  Digital Twin Concept in Managing Industrial Capital Construction Projects Life Cycle , 2018, 2018 Eleventh International Conference "Management of large-scale system development" (MLSD.

[10]  Meng-Han Tsai,et al.  Selection and evaluation of color scheme for 4D construction models , 2013, J. Inf. Technol. Constr..

[11]  Amit P. Sheth,et al.  The SSN ontology of the W3C semantic sensor network incubator group , 2012, J. Web Semant..

[12]  MaryAnne M. Gobble,et al.  Big Data: The Next Big Thing in Innovation , 2013 .

[13]  Pieter Pauwels,et al.  Semantic web technologies in AEC industry: A literature overview , 2017 .

[14]  Pieter Pauwels,et al.  EXPRESS to OWL for construction industry: Towards a recommendable and usable ifcOWL ontology , 2016 .

[15]  Andrew Baldwin,et al.  Handbook for Construction Planning and Scheduling , 2014 .

[16]  Timo Hartmann,et al.  Comparing mindfulness in manual and 4D supported coordination practices , 2014 .

[17]  Fei Tao,et al.  Digital Twin and Big Data Towards Smart Manufacturing and Industry 4.0: 360 Degree Comparison , 2018, IEEE Access.

[18]  Jack Chin Pang Cheng,et al.  A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM) , 2016 .

[19]  Zixiao Zhang,et al.  4D beyond construction: spatio-temporal and life-cyclic modeling and visualization of infrastructure data , 2018, J. Inf. Technol. Constr..

[20]  Stefan Boschert,et al.  Digital Twin—The Simulation Aspect , 2016 .

[21]  Jennifer A. Macdonald,et al.  5D BIM: A Case Study of an Implementation Strategy in the Construction Industry , 2014 .

[22]  Burcu Akinci,et al.  Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD , 2014 .

[23]  Azad M. Madni,et al.  Leveraging Digital Twin Technology in Model-Based Systems Engineering , 2019, Syst..

[24]  Zhigang Shen,et al.  A Framework for a Site Safety Assessment Model Using Statistical 4D BIM-Based Spatial-Temporal Collision Detection , 2016 .

[25]  Luis F. Alarcón,et al.  Multidisciplinary Design Optimization through process integration in the AEC industry: Strategies and challenges , 2017 .

[26]  Sylvain Kubicki,et al.  Assessment of synchronous interactive devices for BIM project coordination: Prospective ergonomics approach , 2019, Automation in Construction.

[27]  Yacine Rezgui,et al.  Towards the next generation of smart grids: Semantic and holonic multi-agent management of distributed energy resources , 2017 .

[28]  Sandro Wartzack,et al.  Shaping the digital twin for design and production engineering , 2017 .

[29]  Wei Cao,et al.  Smart steel bridge construction enabled by BIM and Internet of Things in industry 4.0: A framework , 2018, 2018 IEEE 15th International Conference on Networking, Sensing and Control (ICNSC).

[30]  Uwe Stilla,et al.  Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM , 2017, PFG – Journal of Photogrammetry, Remote Sensing and Geoinformation Science.

[31]  Christian Koch,et al.  Three-Dimensional Tracking of Construction Resources Using an On-Site Camera System , 2012, J. Comput. Civ. Eng..

[32]  Pieter Pauwels,et al.  A semantic rule checking environment for building performance checking , 2011 .

[33]  Changmin Kim,et al.  Automated construction progress measurement using a 4D building information model and 3D data , 2013 .

[34]  Jack Chin Pang Cheng,et al.  A semi-automated approach to generate 4D/5D BIM models for evaluating different offshore oil and gas platform decommissioning options , 2017 .

[35]  Markus König,et al.  Interior construction state recognition with 4D BIM registered image sequences , 2018 .

[36]  Hergen Pargmann,et al.  Intelligent big data processing for wind farm monitoring and analysis based on cloud-technologies and digital twins: A quantitative approach , 2018, 2018 IEEE 3rd International Conference on Cloud Computing and Big Data Analysis (ICCCBDA).

[37]  Jochen Teizer,et al.  Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA) , 2015 .

[38]  Mani Golparvar-Fard,et al.  Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs , 2015 .

[39]  Xiaobing Wu,et al.  Monitoring workers' attention and vigilance in construction activities through a wireless and wearable electroencephalography system , 2017 .

[40]  Saeed Karshenas,et al.  Integrating BIM and Project Schedule Information Using Semantic Web Technology , 2016 .

[41]  Feniosky Peña-Mora,et al.  Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry , 2011 .

[42]  L. Madrazo,et al.  Connecting building component catalogues with BIM models using semantic technologies: an application for precast concrete components , 2015 .

[43]  Haijiang Li,et al.  Crowd simulation-based knowledge mining supporting building evacuation design , 2018, Adv. Eng. Informatics.

[44]  Nashwan Dawood,et al.  Development of workspace conflict visualization system using 4D object of work schedule , 2014, Adv. Eng. Informatics.

[45]  Christophe Cruz,et al.  Interpretation and automatic integration of geospatial data into the Semantic Web , 2019, Computing.

[46]  Marc Priggemeyer,et al.  Experimentable Digital Twins—Streamlining Simulation-Based Systems Engineering for Industry 4.0 , 2018, IEEE Transactions on Industrial Informatics.

[47]  Kay Smarsly,et al.  Automated Generation of Construction Sequences using Building Information Models , 2014 .

[48]  Homeira Shayesteh Digital Built Britain Level 3 Building Information Modelling Strategic Plan , 2015 .

[49]  Yu Zheng,et al.  An application framework of digital twin and its case study , 2018, Journal of Ambient Intelligence and Humanized Computing.

[50]  David Heesom,et al.  Trends of 4D CAD applications for construction planning , 2004 .

[51]  Abdulmotaleb El Saddik,et al.  C2PS: A Digital Twin Architecture Reference Model for the Cloud-Based Cyber-Physical Systems , 2017, IEEE Access.

[52]  Chimay J. Anumba,et al.  Cyber-physical systems integration of building information models and the physical construction , 2015 .

[53]  Martijn J. Booij,et al.  Simulation and forecasting of streamflows using machine learning models coupled with base flow separation , 2018, Journal of Hydrology.

[54]  Hanbin Luo,et al.  A BIM-based construction quality management model and its applications , 2014 .

[55]  Vacharapoom Benjaoran,et al.  An integrated safety management with construction management using 4D CAD model , 2010 .

[56]  F. Henry Abanda,et al.  Trends in built environment semantic Web applications: Where are we today? , 2013, Expert Syst. Appl..

[57]  Charles M. Eastman,et al.  Validations for ensuring the interoperability of data exchange of a building information model , 2015 .

[58]  Mohamed Al-Hussein,et al.  BIM-based integrated approach for detailed construction scheduling under resource constraints , 2015 .

[59]  Edward Curry,et al.  Linking building data in the cloud: Integrating cross-domain building data using linked data , 2013, Adv. Eng. Informatics.

[60]  Robert John Lark,et al.  BIM for infrastructure: An overall review and constructor perspective , 2016 .

[61]  Ove Lagerqvist,et al.  Using visualization technologies for design and planning of a healthy construction workplace , 2010 .

[62]  Chimay J. Anumba,et al.  Cyber-physical systems for temporary structure monitoring , 2016 .

[63]  David Heesom,et al.  The need for multi-LOD 4D simulations in construction projects , 2019, J. Inf. Technol. Constr..

[64]  Hyunjoo Kim,et al.  Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology , 2013 .

[65]  Zhen-Zhong Hu,et al.  BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials , 2011 .

[66]  Stephen Emmitt,et al.  Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views , 2018, Journal of Building Engineering.

[67]  Neda Mohammadi,et al.  Smart city digital twins , 2017, 2017 IEEE Symposium Series on Computational Intelligence (SSCI).

[68]  Jakob Beetz,et al.  IfcOWL: A case of transforming EXPRESS schemas into ontologies , 2008, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[69]  David Bordoli,et al.  A Handbook for Construction Planning and Scheduling: Baldwin/A Handbook for Construction Planning and Scheduling , 2014 .

[70]  Brenda McCabe,et al.  IFC-Based Development of As-Built and As-Is BIMs Using Construction and Facility Inspection Data: Site-to-BIM Data Transfer Automation , 2018, J. Comput. Civ. Eng..

[71]  John Messner,et al.  Visualization in 4D Construction Management Software: A Review of Standards and Guidelines , 2014 .

[72]  Amin Hammad,et al.  Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects , 2015 .

[73]  Eann A. Patterson,et al.  A framework for an integrated nuclear digital environment , 2016 .

[74]  Nashwan Dawood,et al.  Construction workspace management within an Industry Foundation Class-Compliant 4D tool , 2015 .

[75]  Timo Hartmann,et al.  4D CAD models to support the coordination of construction activities between contractors , 2015 .

[76]  Fei Tao,et al.  Digital twin-driven product design, manufacturing and service with big data , 2017, The International Journal of Advanced Manufacturing Technology.

[77]  Rafael Sacks,et al.  Visualization of Work Flow to Support Lean Construction , 2009 .

[78]  Pete Smith,et al.  BIM & the 5D Project Cost Manager , 2014 .

[79]  Colorado Colorado,et al.  AMERICAN SOCIETY OF CIVIL ENGINEERS , 2010 .

[80]  Sheryl Staub-French,et al.  Creating flexible mappings between building information models and cost information , 2014 .

[81]  Judith B. Strother,et al.  Drowning in Data: A Review of Information Overload within Organizations and the Viability of Strategic Communication Principles , 2012 .

[82]  Ghassan Aouad,et al.  Moving beyond the fourth dimension with an IFC-based single project database , 2005 .

[83]  Sylvain Kubicki,et al.  BIM-enhanced collaborative smart technologies for LEAN construction processes , 2017, 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC).

[84]  Zhiliang Ma,et al.  Ontology- and Freeware-Based Platform for Rapid Development of BIM Applications with Reasoning Support , 2017 .

[85]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[86]  Valeriy Vyatkin,et al.  Automatic Generation of a Simulation-Based Digital Twin of an Industrial Process Plant , 2018, IECON 2018 - 44th Annual Conference of the IEEE Industrial Electronics Society.

[87]  Mohamed Marzouk,et al.  Decision support for tower crane selection with building information models and genetic algorithms , 2016 .

[88]  Frédéric Bosché,et al.  Automated progress tracking using 4D schedule and 3D sensing technologies , 2012 .

[89]  Yong K. Cho,et al.  Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM , 2016 .

[90]  Charles M. Eastman,et al.  An ontology-based analysis of the industry foundation class schema for building information model exchanges , 2015, Adv. Eng. Informatics.

[91]  Charles M. Eastman,et al.  BIM-based fall hazard identification and prevention in construction safety planning , 2015 .

[92]  Sheryl Staub-French,et al.  Visualizing high-rise building construction strategies using linear scheduling and 4D CAD , 2009 .

[93]  Kerry L. Taylor,et al.  Semantics for the Internet of Things: Early Progress and Back to the Future , 2019 .

[94]  Mani Golparvar-Fard,et al.  Potential of big visual data and building information modeling for construction performance analytics: An exploratory study , 2017 .

[95]  Charles M. Eastman,et al.  A Knowledge-Based Framework for Quantity Takeoff and Cost Estimation in the AEC Industry Using BIM , 2014 .

[96]  James A. Hendler,et al.  Semantic Web Architecture: Stack or Two Towers? , 2005, PPSWR.

[97]  Wei-Chih Wang,et al.  Integrating building information models with construction process simulations for project scheduling support , 2014 .

[98]  Yacine Rezgui,et al.  Electrical load forecasting models: A critical systematic review , 2017 .

[99]  Zsuzsa Besenyői,et al.  Towards Digitalization of Building Operations with BIM , 2018, IOP Conference Series: Materials Science and Engineering.

[100]  Hans-Joachim Bargstädt,et al.  4D Relationships: The Missing Link in 4D Scheduling , 2016 .

[101]  Weisheng Lu,et al.  Optimizing construction planning schedules by virtual prototyping enabled resource analysis , 2009 .

[102]  Raimar J. Scherer,et al.  Effective Construction Process Monitoring and Control through a Collaborative Cyber-Physical Approach , 2013, PRO-VE.

[103]  Arto Kiviniemi,et al.  The IFC Standard - A Review of History, Development, and Standardization , 2012, J. Inf. Technol. Constr..

[104]  Ali GhaffarianHoseini,et al.  Application of nD BIM Integrated Knowledge-based Building Management System (BIM-IKBMS) for Inspecting the Post-construction Energy Efficiency , 2017 .

[105]  He Zhang,et al.  Digital Twin in Industry: State-of-the-Art , 2019, IEEE Transactions on Industrial Informatics.

[106]  Chrispin Pettang,et al.  BIM for Construction Site Logistics Management , 2018 .

[107]  Wolfgang Huhnt,et al.  Data management for animation of construction processes , 2010, Adv. Eng. Informatics.

[108]  Bjørn Arild Godager,et al.  CRITICAL REVIEW OF THE INTEGRATION OF BIM TO SEMANTIC WEB TECHNOLOGY , 2018, The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences.

[109]  Herman van der Auweraer,et al.  Digital Twins , 2020, SEMA SIMAI Springer Series.

[110]  Mohamed Marzouk,et al.  BIM-based approach for optimizing life cycle costs of sustainable buildings , 2018, Journal of Cleaner Production.

[111]  Edward H. Glaessgen,et al.  The Digital Twin Paradigm for Future NASA and U.S. Air Force Vehicles , 2012 .

[112]  Reiner Anderl,et al.  Digital twin – Proof of concept , 2018 .

[113]  Sangyoon Chin,et al.  Realtime 4D CAD = RFID for Project Progress Management , 2005 .

[114]  Changyoon Kim,et al.  4D CAD model updating using image processing-based construction progress monitoring , 2013 .