Optimal Scheduling of Biodiesel Plants through Property-based Integration with Oil Refineries
暂无分享,去创建一个
Abstract This paper addresses the design and scheduling problem of biodiesel plants in conjunction with typical oil refineries via blending of biodiesel and petro-diesel. The feedstocks are often seasonal and their availability and cost usually vary with time. A multi-period scheduling framework is formulated as an optimization problem to determine the optimal feedstock utilization and blending of biodiesel with petro-diesel using a property-integration framework. A case study is solved to illustrate the applicability of the devised approach.
[1] Mahmoud M. El-Halwagi,et al. Optimal scheduling and operation of biodiesel plants with multiple feedstocks , 2009 .
[2] Mahmoud M. El-Halwagi,et al. Process analysis and optimization of biodiesel production from soybean oil , 2009 .
[3] Mahmoud M. El-Halwagi,et al. Component-less design of recovery and allocation systems: a functionality-based clustering approach , 2000 .
[4] Vasiliki Kazantzi,et al. On the prediction of properties for diesel / biodiesel mixtures featuring new environmental considerations , 2010 .