Effects of CM/GC Project Delivery on Managing Process Risk in Transportation Construction

AbstractTeams that deliver complex transportation construction projects need tools that manage risk and allow for successful delivery. Construction manager/general contractor (CM/GC) project delivery is an alternative method that furnishes public agencies with an attractive option for delivering projects in a less adversarial and more constructive manner by involving the contractor during the design phase. This paper identifies the effects of CM/GC delivery on construction process risk. Owners, contractors, and design engineers with sizable CM/GC experience on transportation-related projects were surveyed to identify differences in the perception of CM/GC processes, especially compared to design-build and design-bid-build project delivery methods. The perceived benefits and disadvantages regarding quality, schedule, cost control, and collaboration/flexibility are discussed. The benefits include strategies for robust process risk management and successful project delivery, while the disadvantages expose ba...

[1]  Douglas D. Gransberg Early Contractor Design Involvement to Expedite Delivery of Emergency Highway Projects , 2013 .

[2]  Keith R. Molenaar,et al.  Risk Assessment and Allocation for Highway Construction Management , 2006 .

[3]  Gregory J. Skulmoski,et al.  Journal of Information Technology Education the Delphi Method for Graduate Research , 2022 .

[4]  John A. Gambatese,et al.  Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .

[5]  Ali Touran,et al.  Owner's Risks versus Control in Transit Projects , 2009 .

[6]  R. Edward Minchin Fall and Rise of the Largest Construction Manager-at-Risk Transportation Construction Project Ever , 2009 .

[7]  Douglas D. Gransberg,et al.  Benefits and Challenges of Implementing Construction Manager/General Contractor Project Delivery: The View from the Field , 2012 .

[8]  Keith R. Molenaar,et al.  Best-Value Procurement Methods for Highway Construction Projects , 2006 .

[9]  Stuart D. Anderson,et al.  Managing Constructibility Reviews to Reduce Highway Project Durations , 2004 .

[10]  Francis T. Hartman,et al.  Construction contracts: the cost of mistrust , 2003 .

[11]  Douglas D. Gransberg,et al.  Construction Manager-at-Risk Project Delivery for Highway Programs , 2010 .

[12]  Giovanni C. Migliaccio,et al.  Guide for Design Management on Design-Build and Construction Manager/General Contractor Projects , 2014 .

[13]  Douglas D Gransberg Construction Manager–General Contractor Project Delivery: A Better, Faster, Smarter Way of Building Transportation Infrastructure , 2013 .

[14]  . G.Ravindran,et al.  Novel Findings in Chromosome Image Segmentation Using Discrete Cosine Transform Based Gradient Vector Flow Active Contours , 2007 .