Planning and visualization for automated robotic crane erection processes in construction

This paper summarizes ongoing research aimed at developing knowledge, methods and tools required to implement automated robotic crane erection processes for the construction industry. In the proposed approach, construction cranes are treated as multi-degree-of-freedom robots and modeled in a virtual environment. Virtual cranes are provided with motion-planning algorithms that enable them to find collision-free and time-efficient paths for each piece that needs to be erected. Inverse kinematics are then used to determine the crane motions required to move elements in previously computed paths. By using an effective method to coordinate the tasks and motions of multiple cranes, the system is also extended to construction projects that require simultaneous use of closely-spaced cranes. The virtual crane model provides realistic visualizations of erection processes and detailed erection schedules.

[1]  Jean-Claude Latombe,et al.  Using a PRM planner to compare centralized and decoupled planning for multi-robot systems , 2002, Proceedings 2002 IEEE International Conference on Robotics and Automation (Cat. No.02CH37292).

[2]  Craig Bennett,et al.  Bechtel Automated Lift Planning System , 1994 .

[3]  Mao-Lin Chiu A Virtual Reality Environment for Construction Simulation , 2000 .

[4]  Koshy Varghese,et al.  COLLISION FREE PATH PLANNING OF COOPERATIVE CRANE MANIPULATORS USING GENETIC ALGORITHM , 2005 .

[5]  Leslie Cousineau,et al.  Construction Robots: The Search for New Building Technology in Japan , 1998 .

[6]  Kent A. Reed,et al.  Using VRML in construction industry applications , 2000, VRML '00.

[7]  Carl T. Haas,et al.  Multiple Heavy Lifts Optimization , 1996 .

[8]  J. Denavit,et al.  A kinematic notation for lower pair mechanisms based on matrices , 1955 .

[9]  William C. Stone,et al.  NIST Research toward Construction Site Integration and Automation , 1999 .

[10]  Jean-Claude Latombe,et al.  Robot motion planning , 1970, The Kluwer international series in engineering and computer science.

[11]  Koshy Varghese,et al.  Automated Path Planning of Cooperative Crane Lifts Using Heuristic Search , 2003 .

[12]  Koshy Varghese,et al.  Graphical visualization for planning heavy lifts , 1994 .

[13]  ShihChung Kang Automated Simulation of the Erection Activities in Virtual Construction , 2004 .

[14]  Liang Y Liu Construction Crane Operation Simulation , 1995 .

[15]  Hong Zhang,et al.  Application of Fuzzy Logic to Simulation for Construction Operations , 2003 .

[16]  Joseph S. B. Mitchell,et al.  Efficient Collision Detection Using Bounding Volume Hierarchies of k-DOPs , 1998, IEEE Trans. Vis. Comput. Graph..

[17]  Thomas M. Murray,et al.  Cost‐effective steel building design , 2000 .

[18]  Bonsang Koo,et al.  Feasibility study of 4D CAD in commercial construction , 2002 .

[19]  Roger V. Bostelman,et al.  Summary of Modeling and Simulation for NIST RoboCrane? Applications , 1997 .

[20]  Colin S. Gray,et al.  A model for the selection of the optimum crane for construction sites , 1984 .

[21]  Vineet R. Kamat,et al.  General-purpose 3D animation with VITASCOPE , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..

[22]  Martin Fischer,et al.  4-D Annotator: A Visual Decision Support Tool for Construction Planners , 1998 .

[23]  Gary David Holt,et al.  Location optimization for a group of tower cranes , 1999 .

[24]  Angel P. del Pobil,et al.  Practical Motion Planning in Robotics: Current Approaches and Future Directions , 1998 .

[25]  Martin Fischer,et al.  Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .

[26]  Ming C. Lin,et al.  A fast algorithm for incremental distance calculation , 1991, Proceedings. 1991 IEEE International Conference on Robotics and Automation.

[27]  Dikai Liu,et al.  Nonlinear Models for Predicting Hoisting Times of Tower Cranes , 2002 .

[28]  Arthur W. T. Leung,et al.  Models for assessing hoisting times of tower cranes , 1999 .

[29]  Leonhard E. Bernold,et al.  On-Line Assistance for Crane Operators , 1997 .

[30]  Colin S. Gray,et al.  A systematic approach to the selection of an appropriate crane for a construction site , 1985 .

[31]  C. M. Tam,et al.  Genetic Algorithm for Optimizing Supply Locations around Tower Crane , 2001 .