Time-Cost Project Management with Solver

According to the definition provided by the Project Management Institute the time and cost constitute two crucial elements of the project management (PM). There are many computer tools supporting the project time and cost management (e.g. SAS/OR Project Management, Primavera Cost Manager, Autotask Pro), but this software does not have all functionalities necessary in the project decision-making process. Therefore, the purpose of this paper is to spur teachers, students and managers to use optimization softwares such as the Excel Solver in the PM. This article deals with time-cost problems that project managers are try-ing to solve and presents the Excel Solver as an extremely useful tool in project management, optimization and simulation. After a discussion concerning the time-cost project analysis and the project network construction, the author demonstrates how to mathematically model and solve a project problem with the aid of the Excel Solver. At the end the results are interpreted. Benefits of using this optimization tool in project time-cost management are numerous. Solver is designed both for small and complex projects. It yields the optimal solution as well as many what-if-analysis results. Thus, the author demonstrates how the project manager can take advantage of the range information and dual values (reduced costs and shadow prices) to check the consequences of changing different project’s parameters and to set the intervals (e.g. for the unit shortening costs or the normal activity times) for which a given optimal schedule does not change. The author also argues that the Solver may successfully support the reactive and proactive project management, because in contradiction to traditional project management softwares, it easily generates brought up to date optimal solutions.

[1]  Gabriela P. Henning,et al.  Computers and Chemical Engineering , 2022 .

[2]  Prabuddha De,et al.  The discrete time-cost tradeoff problem revisited , 1995 .

[3]  Erik Demeulemeester,et al.  A classification of predictive-reactive project scheduling procedures , 2007, J. Sched..

[4]  Helena Gaspars-Wieloch,et al.  Efficiency analysis of the Kaufmann and Dezbazeille algorithm for the deadline problem , 2011 .

[5]  He Xiao-li,et al.  Time/cost trade-offs in project scheduling with time-switch and resource constraints , 2011, 2011 International Conference on E-Business and E-Government (ICEE).

[6]  Cengiz Haksever,et al.  Flexible Model for Time'Cost Tradeoff Problem , 2004 .

[7]  Erik Demeulemeester,et al.  Heuristic Procedures for Reactive Project Scheduling , 2006, Comput. Ind. Eng..

[8]  Chung-Lun Li,et al.  Fully polynomial-time approximation schemes for time-cost tradeoff problems in series-parallel project networks , 2009, Oper. Res. Lett..

[9]  Mario Vanhoucke,et al.  The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects , 2005 .

[10]  Marianthi G. Ierapetritou,et al.  Reactive scheduling using parametric programming , 2008 .

[11]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[12]  R. R. Hocking,et al.  Optimum Time Compression in Project Scheduling , 1970 .

[13]  Moustapha Diaby,et al.  Project crashing in the presence of general non-linear activity time reduction costs , 2011 .

[14]  Benjamin Sach Fully Polynomial Time Approximation Schemes , 2007 .

[15]  Hua Ke,et al.  Solving project scheduling problem with the philosophy of fuzzy random programming , 2012, Fuzzy Optim. Decis. Mak..

[16]  Prabuddha De,et al.  Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks , 1997, Oper. Res..

[17]  Martin Skutella,et al.  Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem , 1997, Math. Oper. Res..

[18]  Konstantinos P. Anagnostopoulos A fast algorithm for time compression in project scheduling , 2002, Oper. Res..

[19]  Sanjay Srivastava,et al.  Project Scheduling: Time-Cost Tradeoff Problems , 2010 .

[20]  Helena Gaspars-Wieloch Przegląd modeli optymalizacyjnych stosowanych w analizie czasowo-kosztowej przedsięwzięć , 2008 .

[21]  Erik Demeulemeester,et al.  Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .

[22]  Renata Dudzińska-Baryła Optymalizacja decyzji w module SAS/OR , 2008 .

[23]  Ashok Mohanty,et al.  Activity modes selection for project crashing through deterministic simulation , 2011 .

[24]  Helena Gaspars-Wieloch,et al.  Uogólnienie modeli optymalizacyjnych służących do generowania krzywych kosztów w analizie czasowo-kosztowej projektu , 2010 .

[25]  Chung-Wei Feng,et al.  Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .