A spatial estimation model for continuous rock mass characterization from the specific energy of a TBM

SummaryBasic principles of the theory of rock cutting with rolling disc cutters are used to appropriately reduce tunnel boring machine (TBM) logged data and compute the specific energy (SE) of rock cutting as a function of geometry of the cutterhead and operational parameters. A computational code written in Fortran 77 is used to perform Kriging predictions in a regular or irregular grid in 1D, 2D or 3D space based on sampled data referring to rock mass classification indices or TBM related parameters. This code is used here for three purposes, namely: (1) to filter raw data in order to establish a good correlation between SE and rock mass rating (RMR) (or tunnelling quality index Q) along the chainage of the tunnel, (2) to make prediction of RMR, Q or SE along the chainage of the tunnel from boreholes at the exploration phase and design stage of the tunnel, and (3) to make predictions of SE and RMR or Q ahead of the tunnel’s face during excavation of the tunnel based on SE estimations during excavation. The above tools are the basic constituents of an algorithm to continuously update the geotechnical model of the rock mass based on logged TBM data. Several cases were considered to illustrate the proposed methodology, namely: (a) data from a system of twin tunnels in Hong Kong, (b) data from three tunnels excavated in Northern Italy, and (c) data from the section Singuerlin-Esglesias of the Metro L9 tunnel in Barcelona.

[1]  G. Exadaktylos,et al.  A Combined Three-Dimensional Geological-Geostatistical-Numerical Model of Underground Excavations in Rock , 2007 .

[2]  Nick Barton,et al.  Engineering classification of rock masses for the design of tunnel support , 1974 .

[3]  Peter K. Kitanidis,et al.  Introduction to geostatistics , 1997 .

[4]  Athanasios Papoulis,et al.  Probability, Random Variables and Stochastic Processes , 1965 .

[5]  Matteo Berti,et al.  TBM performance estimation using rock mass classifications , 2002 .

[6]  R. A. Snowdon,et al.  A study of disc cutting in selected British rocks , 1982 .

[7]  Katsunori Fukui,et al.  Some Attempts for Estimating Rock Strength and Rock Mass Classification from Cutting Force and Investigation of Optimum Operation of Tunnel Boring Machines , 2006 .

[8]  H. K. Kutter,et al.  A study of disc cutting in selected British rocks: Discussion of paper by R. A. Snowdon, M. D. Ryley and J. Temporal, Int. J. Rock Mech. Min. Sci. & Geomech. Abstr.19, 107–121 (1982). , 1983 .

[9]  F. F. Roxborough,et al.  Rock excavation by disc cutter , 1976 .

[10]  R. Ribacchi,et al.  Influence of Rock Mass Parameters on the Performance of a TBM in a Gneissic Formation (Varzo Tunnel) , 2005 .

[11]  Nick Barton,et al.  TBM Tunnelling in Jointed and Faulted Rock , 2000 .

[12]  J. Rostami,et al.  Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction , 2007 .

[13]  Z. T. Bieniawski,et al.  Engineering classification of jointed rock masses , 1973 .

[14]  P. Kitanidis Introduction to Geostatistics: Applications in Hydrogeology , 1997 .

[15]  K. L. Meijer Rock excavation by disc cutter: Discussion of F. F. Roxborough and H. R. Phillips' paper, Int. J. Rock Mech. Min. Sci. & Geomech. Abstr. 12, 361–366 (1975) , 1976 .